Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87997
Export to Endnote
Title: | Annual report ML 24510 for the period ending 6 September 2010 |
Title Holder / Company: | Stirling Zircon Matilda Zircon |
Report id: | CR2010-0871 |
Tenure: | ML24510 |
Year: | 2010 |
Author: | Unknown |
Abstract: | During September 2008 the previous tenement holder Matilda Minerals Ltd was placed into receivership due to cash flow problems with its Tiwi Islands Andranangoo Project located within ML 24510. In July 2009, Olympia Resources Ltd (now renamed to Matilda Zircon Limited) purchased the Tiwi Island assets of Matilda Minerals from the administrators of Matilda Minerals with the aim of re-establishing mining and processing activities on the island. Mining and processing operations commenced at Andranangoo in early November 2006 and were completed in September 2008. The vast majority of the economic mineralisation within ML 24510 (at a nominal 2% HM cutoff) has been mined with only remnant mineralisation at a lower grade remaining. No further exploration is required to define mineralised zones. |
Date Added: | 3-Dec-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
ML24510_2010_A.pdf | 1.87 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.