Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87339
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRobinson, PFen_US
dc.date.accessioned2018-07-09T23:39:51Z-
dc.date.issued2009en_US
dc.identifier.govdocCR2009-0825en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87339en_US
dc.description.abstractThe Love Creek Project comprises exploration licence 25164 located in the Mary River region approximately 100 kilometres east of Darwin in the Northern Territory. Uranex is targeting East Alligator River Uranium Field (EARUF) and/or South Alligator Rivers Uranium Field (SARUF) and/or Rum Jungle Uranium Field (RJUF) style uranium deposits. This is based on the recognition that the Lower Proterozoic stratigraphy of the area has some similarities that may equate with stratigraphy in these uranium fields Most of the outcrop areas are mapped as the Mundogie Sandstone (Ppm). The Mundogie Sandstone is thought to be possibly equivalent to the magnetic Upper Cahill Formation of the EARUF further east. Hence the Lower Cahill host equivalent would be stratigraphically below it. This second annual report describes activities conducted for the period 5th November 2008 to 4th November 2009. The results of the year 1 program did not establish precise targets for drilling. It was decided that an Airborne Electromagnetic (AEM) Survey may locate conductive targets in the favourable host lithologies which could be tested by drilling. These would be bedrock conductors representing graphitic or chloritic / pyritic facies and or structures. During Year 2, an AEM Survey was flown by Fugro Geophysics in association with Geoscience Australia (GA). After many delays, the initial survey data was received in May 2009. This was later processed and interpreted. Drill targets were chosen using these conductors, their potential host stratigraphy, proximity to surface uranium anomalies and accessibility. Drill follow up to test these litho-structural targets by Reverse Circulation drilling will be done at the peak of the next dry season in year 3 when access is to the flood plains is available.en_US
dc.subject.classificationUraniumen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationAerial EM surveysen_US
dc.titleLove Creek Project EL 25164 Annual report for the period 5 November 2008 to 4 November 2009en_US
dc.relation.isatmap100Mary River 5272en_US
dc.relation.isatmap100Point Stuart 5273en_US
dc.relation.isatmap100Field Island 5373en_US
dc.relation.isatmap250Alligator River SD5301en_US
dc.relation.isatmap250Darwin SD5204en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.relation.isatgeolprovinceMoney Shoal Basinen_US
dc.description.stratnameNanambu Complex, Rum Jungle Complex, Mundogie Sandstoneen_US
dc.identifier.tenureEL25164en_US
dc.description.modifyhistory20/11/2009en_US
dc.description.modifyhistory30/11/2009en_US
dc.description.modifyhistory11/11/2013en_US
dc.description.modifyhistory12/06/2018en_US
dc.contributor.holderUranexen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2009en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25164_2009_A.pdf2.59 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader