Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87320
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPrice, Gen_US
dc.date.accessioned2018-07-03T23:02:19Z-
dc.date.issued2009en_US
dc.identifier.govdocCR2009-0944en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87320en_US
dc.description.abstractThe Bowgan Project, located 250 km northeast of Tennant Creek, consists of two contiguous exploration licences EL 24115 (Bowgan) and 24195 (Benmara) and EL 24196 (Creswell), which is located southwest of the other two licences. In April 2006 Hindmarsh Resources Limited (now Mega Hindmarsh) and Marengo Mining Limited entered into a Joint Venture agreement whereby Hindmarsh is entitled to earn a 51% interest in the Bowgan Project by expending $ 200,000 in three years. The primary mineralisation model considered was for unconformity related uranium and gold at the contact between the crystalline basement rocks (in particular the Murphy Metamorphics) and the overlying sedimentary rocks of the south Nicholson Basin. Identification of a potential chemical trap, such as a cross cutting dolerite or graphitic shale, was also used as a targeting criterion. Exploration activities to date, have concentrated on the identification and delineation of potential chemical trap sites within the tenement area. A preliminary review of data identified several target locations, resulting in an initial ground exploration program via geophysical methods. These were identified as having the interpreted unconformity surface, with co-incident dolerite and basement conductor (graphite) features, Exploration to date has been focussed towards further assessment of each of these target locations. Negotiations for a joint-venture agreement with Bowgan Minerals limited commenced during the reporting period. Field exploration work on EL 24253 by Mega Hindmarsh Pty Limited has been halted during the reporting period directly as a result of these negotiations.en_US
dc.subject.classificationUraniumen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationGolden_US
dc.titleEL 24196 Bowgan Project Fifth annual report for the period 8 December 2008 to 7 December 2009en_US
dc.relation.isatmap100Paradise Bore 6161en_US
dc.relation.isatmap100Corella Creek 6061en_US
dc.relation.isatmap250Brunette Downs SE5311en_US
dc.relation.isatgeolprovinceGeorgina Basinen_US
dc.relation.isatgeolprovinceMcArthur Basinen_US
dc.description.stratnameSouth Nicholson Group, Tawallah Group, Murphy Metamorphicsen_US
dc.identifier.tenureEL24196en_US
dc.description.modifyhistory06/01/2010en_US
dc.description.modifyhistory11/11/2013en_US
dc.description.modifyhistory12/06/2018en_US
dc.description.modifyhistory04/07/2018en_US
dc.contributor.holderMarengo Miningen_US
dc.contributor.holderMega Hindmarsh Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2009en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24196_2009_A.pdf4.9 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader