Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/87298
Export to Endnote
Title: | EL 10335 7th Annual report for the period ending 14 August 2009 |
Title Holder / Company: | Hartz Range Mines Lagoon Creek Resources |
Report id: | CR2009-0564 |
Tenure: | EL10335 |
Year: | 2009 |
Author: | Diprose, G |
Abstract: | Exploration of the Wollogorang Project by Hartz Range Mines Pty Ltd during the last period has been heavily focussed on EL 10335. Field work has been intensified during this field season with ground IP surveys, soil surveys, detailed geological mapping and rock sampling and widespread reconnaissance mapping and rock sampling. The drill program that commenced in 2007 was also completed. Lagoon Creek Resources Pty Ltd continued operations on the Debbil Debbil Uranium Project in the southern part of the EL. Work consisted of scintillometer surveys. |
Date Added: | 26-Jun-2018 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL10335_2009_A.pdf | 2.37 MB | Add | |
CR2009-0564_Appendix1_Lagoon_Creek_Scintillometer_Data.zip | 6.36 MB | ZIP | Add |
CR2009-0564_Appendix2_Hartz_Range_Soil_Samples.zip | 2.23 MB | ZIP | Add |
CR2009-0564_Appendix3_Hartz_Range_Rockchip_Samples.zip | 1.26 MB | ZIP | Add |
CR2009-0564_Appendix4_Hartz_Range_Drilling_Data.zip | 3.48 MB | ZIP | Add |
CR2009-0564_Appendix5_Hartz_Range_IP_Report.zip | 6.72 MB | ZIP | Add |
CR2009-0564_Appendix6_Hartz_Range_Geological_Mapping.zip | 21.96 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.