Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86510
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorArcher, Gen_US
dc.date.accessioned2017-10-17T02:17:05Z-
dc.date.issued2008en_US
dc.identifier.govdocCR2008-0553en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86510en_US
dc.description.abstractA significant amount of expenditure was put into the planning, superintendence, execution and preliminary interpretation of geophysical surveys over the period. A new airborne magnetic and radiometric survey was flown by external contractor UTS Geophysics over a large part of EL 24539 at the cost of $16876 (ex-gst). Airborne EM survey lines were collected using the RepTEM system carried out by external contractor GPX Geophysics at the cost of $1499 (ex-gst), making a grand total of $18375 (ex-gst) paid to external airborne contractors. Thirteen days was spent in the field where geological mapping and geochemical sampling was carried out as follow up to geophysical interpretation carried out using new geophysical airborne data. Various samples were sent to a laboratory for analysis. Continued geophysical and geological interpretation and integration with results from field work are expected to lead to further geological surveying and sampling and probable drilling in the new field season. Although expenditure of $30,000 has been nominated for the new field season, significantly higher expenditure is anticipated, subject to approval of a drilling program.en_US
dc.subject.classificationBase metalsen_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationGeologyen_US
dc.subject.classificationSamplingen_US
dc.subject.classificationRock chip samplingen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationAerial magnetic surveysen_US
dc.subject.classificationAerial radiometric surveyen_US
dc.subject.classificationGeological mappingen_US
dc.subject.classificationReconnaissanceen_US
dc.subject.classificationAnalysisen_US
dc.subject.classificationGeological interpretationen_US
dc.titleAnnual report for period ending 16 August 2008 Exploration License 24539en_US
dc.relation.isatmap100Ranford Hill 5370en_US
dc.relation.isatmap250Mount Evelyn SD5305en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameKoolpin Formation, Allamber Springs Graniteen_US
dc.description.geochemicalsamplingrock chips receiveden_US
dc.description.mineprospectnameMcCarthys Prospecten_US
dc.identifier.tenureEL24539en_US
dc.description.modifyhistory15/10/2008en_US
dc.description.modifyhistory21/11/2013en_US
dc.description.modifyhistory17/08/2017en_US
dc.description.modifyhistory19/09/2017en_US
dc.description.modifyhistory17/10/2017en_US
dc.contributor.holderArcher, Gen_US
dc.contributor.holderKastrissios, Jen_US
dc.contributor.holderLangley, DJen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2008en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24539_2008_A.pdf1.28 MBPDF Add
CR2008-0553_Data.zip101.89 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader