Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86353
Export to Endnote
Title: | Annual report EL 24463, Ngalia Regional Project, period ending 6 February 2007 |
Title Holder / Company: | Valhalla Uranium Southern Cross Exploration Energy Metals |
Report id: | CR2007-0041 |
Tenure: | EL24463 |
Year: | 2007 |
Author: | Hughes, DL |
Abstract: | Exploration undertaken in the period 06 February 2006 to 06 February 2007 included: Re-establishment of the exploration camp; Review/compilation of historical data; Converting historic data to digital format; Surface prospecting and mapping; Exploration planning/logistics; and CLC exploration notifications/negotiations. Limited prospecting was undertaken to confirm previous mapping results and to gain a better understanding of the local prospect geology/terrain with a view to logistics and work planning for exploration programs scheduled for 2007. Field logistics of operating on the tenement was examined including, condition and location of major access routes for heavy vehicles, logistics in operating in locations close to population areas, logistics in relation to potable, drilling and ground water use/contamination. Scoping, budgeting, planning and sourcing equipment for intended work was undertaken during the period. Significant access clearance will be required for future work and this will be done via a staged program of grading and road building in conjunction with other areas of the Ngalia Project Area. |
Date Added: | 1-Oct-2017 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24463_2007_A_01.pdf | 762.41 kB | Add | |
EL24463_2007_A_02_DPIFM_Covering_Letter.pdf | 21.19 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.