Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86231
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBeckwith, Aen_US
dc.date.accessioned2017-09-17T23:28:46Z-
dc.date.issued2007en_US
dc.identifier.govdocCR2007-0156en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86231en_US
dc.description.abstractExploration activities completed during the reporting period include: Re-establishment of previous exploration tracks; Establishment of camp facilities; Regional gravity survey over the entire tenement area; Detailed gravity surveys over priority prospective regions within the tenement; Processing of the gravity surveys; Orientation IP survey; Drill site preparation; and Diamond drilling on two prospects Explorer 108 and 142. Existing exploration tracks were upgraded to allow exploration to commence together with the establishment of a base exploration camp immediately north of EL 8994. An on ground gravity survey was completed over the entire tenement area on 500m station spacing x 1000m line spacing. Further smaller prospect areas were infilled to a minimum of 50m x 200m spacing. A trial surface IP survey was completed however results indicate the 200m Wiso Basin sediments are impeding the IP response over the known sulphide mineralisation. A total of 11 diamond drill holes were completed during the reporting period. Eight (8) holes were completed at the Explorer108 and three (3) at the Explorer142 prospects respectively. Highly encouraging Zn-Pb-Ag results were encountered at Explorer 108 and also Cu- Au at Explorer 142. Over $2M was spent during the reporting period. The proposed 2007 programme is planned to include the acquisition of additional infill gravity stations throughout the tenement, trial downhole IP, RC and diamond drilling at Explorer 108 and Explorer 142.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationBase metalsen_US
dc.subject.classificationCopperen_US
dc.subject.classificationLeaden_US
dc.subject.classificationZincen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationGeophysical dataen_US
dc.subject.classificationGravity surveysen_US
dc.subject.classificationIP surveysen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationDrill collarsen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationDrill core samplingen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.titleEL 8994 Rover Project Tennant Creek Inlier Annual Report reporting period 8 March 2006 to 7 March 2007en_US
dc.relation.isatmap100Billiatt 5558en_US
dc.relation.isatmap250Green Swamp Well SE5313en_US
dc.relation.isatgeolprovinceWiso Basinen_US
dc.relation.isatgeolprovinceTennant Regionen_US
dc.relation.isatgeolprovinceWarramunga Provinceen_US
dc.description.stratnameWarramunga Groupen_US
dc.description.stratnameFlynn Subgroupen_US
dc.description.geochemicalsampling2337 Drill samplesen_US
dc.description.drilling12 Diamond holes for 5,892 m (NR108D001, NR108D002, NR108D003, NR108D004, NR108D005, NR108D006, NR108D007, NR108D008, NR108D009, NR142D001, NR142D002, NR142D003)en_US
dc.description.mineprospectnameExplorer 108en_US
dc.description.mineprospectnameExplorer 142en_US
dc.identifier.tenureEL8994en_US
dc.description.modifyhistory16/05/2007en_US
dc.description.modifyhistory21/11/2013en_US
dc.description.modifyhistory11/07/2017en_US
dc.description.modifyhistory21/02/2019en_US
dc.description.modifyhistory21/12/2020en_US
dc.contributor.holderNavarre Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2007en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL8994_2007_A.pdf1.16 MBPDF Add
CR2007-0156_Appendix4_Drilling_Data.zip122.91 kBZIP Add
CR2007-0156_Appendix5_Drill_Sections_and_Plans.zip262.57 kBZIP Add
CR2007-0156_Geophysics.zip247.58 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader