Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86182
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPevely, SGen_US
dc.contributor.authorMcIntyre, Men_US
dc.date.accessioned2017-09-06T05:47:28Z-
dc.date.issued2007en_US
dc.identifier.govdocCR2007-0483en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86182en_US
dc.description.abstractEL 8189 is situated within the highly prospective Proterozoic McArthur Basin, host to the world class McArthur River (HYC) zinc-lead-silver deposit. The application for EL 8189 was first submitted by Mount Isa Mines Ltd on 28th April 1993 over MLN's 1121, 1122, 1123 and 1124 held by McArthur River Mining Pty Ltd. The application was lodged because of concerns over: i) The adoption of the geodetic datum GDA94 leaving a 200m wide vacant strip of land between the Mineral Leases and adjoining MIM exploration licence EL 8078. ii) The validity of the Mineral leases post Mabo High Court decision in 1992. The remaining blocks are still covered by McArthur River Mining's MLN's 1123 and 1124 which are tenured until 2018. With the total relinquishment of EL 8078 and the continued MLN tenure, the requirement for EL 8189 has been somewhat academic even though previous reporting has duly recorded any exploration activities within the lease. This comprised exploration diamond drilling and any sub-surface activities centred on site investigations for the proposed expansion of the McArthur River zinc-lead deposit from the existing underground mine to a large scale open cut operation. The licence, originally comprising 39 blocks totalling 109.3 sq km, was granted for a period of six years on 6th October 2003. At the end of the 2006 reporting year, a 50% relinquishment of the remaining 19 blocks was undertaken in line with the requirements of the Mining Act, leaving a total of 7.5 graticule blocks. The 2007 reduction of EL8189 has reduced the tenement to 3 graticule blocks. The area covered by EL 8189 has been intensely explored over the past 50 years by Mount Isa Mines as part of investigations into the development of the McArthur River (HYC) deposit. Exploration activities were also conducted over the leases areas, targeting the surrounding highly prospective lithologies of the McArthur Basin. All of the prospects delineated, including the HYC deposit, have since been converted to separate Mining and Mineral Leases, formerly held by Mount Isa Mines, now Xstrata Zinc. No work was recorded against the remaining graticule blocks of EL 8189 during the 2006 - 2007 reporting period.en_US
dc.subject.classificationBase metalsen_US
dc.subject.classificationSilveren_US
dc.subject.classificationLeaden_US
dc.subject.classificationZincen_US
dc.subject.classificationExploration historyen_US
dc.titleExploration Licence EL 8189 third (sic fourth) annual report year ending 6 October 2007en_US
dc.relation.isatmap100Borroloola 6165en_US
dc.relation.isatmap250Bauhinia Downs SE5303en_US
dc.relation.isatgeolprovinceMcArthur Basinen_US
dc.description.stratnameCooley Dolomite Member, Reward Dolomiteen_US
dc.description.mineprospectnameHYC Depositen_US
dc.description.mineprospectnameMcArthur River Projecten_US
dc.identifier.tenureEL8189en_US
dc.description.modifyhistory06/11/2007en_US
dc.description.modifyhistory21/11/2013en_US
dc.description.modifyhistory28/06/2017en_US
dc.contributor.holderXstrataen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2007en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL8189_2007_A.pdf607.91 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader