Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86022
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.date.accessioned2017-08-13T22:13:11Z-
dc.date.issued2016en_US
dc.identifier.govdocCR2016-0761en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/86022en_US
dc.description.abstractIn 2001, Holcim, then CSR Readymix, prepared a Notice Of Intent with intentions of extracting the hard rock. Shortly after, local residents and environmental groups worked to reduce mining activities in the area. The load rating on the local roads was reduced to 10t, which eliminated any heavy traffic out of the quarry. As a result, extraction and haulage of the material was made difficult and there has been little to no activity on the site. Holcim plans to relinquish the site in 2017; leases MLN 387, MLN 388, MLN 389, MLN 392, MLN 393, MLN 394, MLN 396 and MLN 397.en_US
dc.subject.classificationQuartziteen_US
dc.subject.classificationGravelen_US
dc.subject.classificationIndustrial materialsen_US
dc.subject.classificationQuarriesen_US
dc.titleNoonamah Quarry, Elizabeth Valley, Annual report 2016en_US
dc.relation.isatmap100Noonamah 5172en_US
dc.relation.isatmap250Darwin SD5204en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.identifier.tenureMLN387en_US
dc.identifier.tenureMLN388en_US
dc.identifier.tenureMLN389en_US
dc.identifier.tenureMLN392en_US
dc.identifier.tenureMLN393en_US
dc.identifier.tenureMLN394en_US
dc.identifier.tenureMLN396en_US
dc.identifier.tenureMLN397en_US
dc.description.modifyhistory16/03/2017en_US
dc.contributor.holderHolcim Australiaen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2016en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR362_2016_GA.pdf108.43 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader