Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85825
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Taylor, W | en_US |
dc.date.accessioned | 2017-07-30T23:25:38Z | - |
dc.date.issued | 2011 | en_US |
dc.identifier.govdoc | CR2011-0231 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85825 | en_US |
dc.description.abstract | During the current reporting period no on-ground exploration was conducted due to priorities elsewhere and due to unseasonal rains which limited access to the site. However, the tenement area was included in the CSIRO Joint Surveys Uranium Mineral Systems Project for the Ngalia Basin. The aim of the project is to better understand the controls on uranium mineralisation in the Bigrlyi area and in the Ngalia basin as a whole. The final report of results for this project is due in the second half of 2011. | en_US |
dc.subject.classification | Uranium | en_US |
dc.subject.classification | Exploration history | en_US |
dc.title | Annual report EL 24804 Waite Creek Ngalia Regional Project period ending 15 April 2011 | en_US |
dc.relation.isatmap100 | Gurner 5052 | en_US |
dc.relation.isatmap100 | Vaughan 5053 | en_US |
dc.relation.isatmap250 | Mount Doreen SF5212 | en_US |
dc.relation.isatgeolprovince | Ngalia Basin | en_US |
dc.identifier.tenure | EL24804 | en_US |
dc.description.modifyhistory | 23/05/2011 | en_US |
dc.contributor.holder | Energy Metals | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR2011 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24804_2011_A.pdf | 1.89 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.