Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85303
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Muir, M | en_US |
dc.date.accessioned | 2017-05-25T05:46:29Z | - |
dc.date.issued | 2006 | en_US |
dc.identifier.govdoc | CR2006-0359 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85303 | en_US |
dc.description.abstract | During 2005-2006, GBS Gold Pty Ltd successfully made a takeover of Northern Gold NL and has purchased Harmony Golds (through subsidiary Buffalo Creek Mines) 50% share of the Burnside Project as of 1st of April 2006. Work during the period June 27th 2005 to June 26th 2006 included; mapping and rock chipping in the Lymberover prospect (north of John Bull), drilling within the Zapopan project area (2719.6m of core drilling for Five diamond holes and six wedge holes) It also included drilling within the Rising Tide gold deposit project area (161.2m of core drilling for two diamond holes, one failed hole and twenty one RC holes (824m)). Up until June 26th 2006 mining activities within the Leases were restricted to a care and maintenance programme in readiness for a decision to start operations. Mining is scheduled to commence September 2006 in both Rising Tide (open cut) and Zapopan (underground) for trucking to Union Reefs mill'. All work reported was within MLN 1139. Exploration was at a minimum on the remainder of the Brocks Creek tenement group. | en_US |
dc.subject.classification | Precious metals | en_US |
dc.subject.classification | Gold | en_US |
dc.subject.classification | Geological setting | en_US |
dc.subject.classification | Mineralisation | en_US |
dc.subject.classification | Exploration history | en_US |
dc.subject.classification | Geological mapping | en_US |
dc.subject.classification | Drilling | en_US |
dc.subject.classification | RC drilling | en_US |
dc.subject.classification | Diamond drilling | en_US |
dc.subject.classification | Drill collars | en_US |
dc.subject.classification | Drill hole logs | en_US |
dc.subject.classification | Drill hole data | en_US |
dc.subject.classification | Drill core sampling | en_US |
dc.subject.classification | Drill cuttings sampling | en_US |
dc.subject.classification | Physical properties | en_US |
dc.subject.classification | Density | en_US |
dc.subject.classification | Specific Gravity | en_US |
dc.subject.classification | Geochemical exploration | en_US |
dc.subject.classification | Geochemical sampling | en_US |
dc.subject.classification | Rock chip sampling | en_US |
dc.title | Annual exploration report Brocks Creek Group year ending 26 June 2006, MLN 1139, MLN 176, MCN 4689-4697, MCN 4701-4703, MCN 4863-4871, MCN 4895-4899 | en_US |
dc.relation.isatmap100 | Batchelor 5171 | en_US |
dc.relation.isatmap250 | Pine Creek SD5208 | en_US |
dc.relation.isatgeolprovince | Pine Creek Orogen | en_US |
dc.description.stratname | Koolpin Formation, Gerowie Tuff, Zamu Dolerite, Burnside Granite | en_US |
dc.description.drilling | 2 Diamond holes for 161.2 m (RTDH001, RTDH001x, RTDH002) | en_US |
dc.description.drilling | 5 Diamond holes and 6 wedge holes for 2,719.6m (ZEX009, ZEX009W1, ZEX009W2, ZEX009W3, ZEX010, ZEX010W1, ZEX011, ZEX011W1, ZEX012, ZEX013, ZEX013A) | en_US |
dc.description.drilling | 21 RC holes for 824 m (RTRC001 to RTRC021) | en_US |
dc.description.mineprospectname | Lymberover | en_US |
dc.description.mineprospectname | Zapopan | en_US |
dc.description.mineprospectname | Alligator | en_US |
dc.description.mineprospectname | Faded Lily | en_US |
dc.description.mineprospectname | Rising Tide | en_US |
dc.identifier.tenure | MLN1139 | en_US |
dc.identifier.tenure | MLN176 | en_US |
dc.identifier.tenure | MCN4689 | en_US |
dc.identifier.tenure | MCN4690 | en_US |
dc.identifier.tenure | MCN4691 | en_US |
dc.identifier.tenure | MCN4692 | en_US |
dc.identifier.tenure | MCN4693 | en_US |
dc.identifier.tenure | MCN4694 | en_US |
dc.identifier.tenure | MCN4695 | en_US |
dc.identifier.tenure | MCN4696 | en_US |
dc.identifier.tenure | MCN4697 | en_US |
dc.identifier.tenure | MCN4701 | en_US |
dc.identifier.tenure | MCN4702 | en_US |
dc.identifier.tenure | MCN4703 | en_US |
dc.identifier.tenure | MCN4863 | en_US |
dc.identifier.tenure | MCN4864 | en_US |
dc.identifier.tenure | MCN4865 | en_US |
dc.identifier.tenure | MCN4866 | en_US |
dc.identifier.tenure | MCN4867 | en_US |
dc.identifier.tenure | MCN4868 | en_US |
dc.identifier.tenure | MCN4869 | en_US |
dc.identifier.tenure | MCN4870 | en_US |
dc.identifier.tenure | MCN4871 | en_US |
dc.identifier.tenure | MCN4895 | en_US |
dc.identifier.tenure | MCN4896 | en_US |
dc.identifier.tenure | MCN4897 | en_US |
dc.identifier.tenure | MCN4898 | en_US |
dc.identifier.tenure | MCN4899 | en_US |
dc.description.modifyhistory | 28/11/2013 | en_US |
dc.description.modifyhistory | 25/05/2017 | en_US |
dc.contributor.holder | GBS Gold Australia | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR2006 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20060359_2006_GA.pdf | 2.08 MB | Add | |
CR2006-0359_Appendix2_Digital_Data.zip | 300.96 kB | ZIP | Add |
CR2006-0359_Appendix2_Zap_Geology.zip | 5.35 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.