Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85289
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMuir, Men_US
dc.date.accessioned2017-05-24T01:33:12Z-
dc.date.issued2006en_US
dc.identifier.govdocCR2006-0495en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/85289en_US
dc.description.abstractThe Esmeralda tenement (ERL130) is situated 170 km SE of Darwin, NT, and 8 km north east of Pine Creek. GBS Gold P/L acquired the lease in April 2006 as part of a take over and acquisition of the companies that ran the Burnside Joint Venture. The project assets had been previously owned by Acacia Resources and later AngloGold (Ashanti) Ltd, who carried out mining and milling operations at Union Reefs prior to closure in July 2003. At Esmeralda previous exploration by Cyprus Gold Corporation and Acacia Resources had outlined two significant adjacent and sub parallel gold resources (A and B) some 4 km south of the Union Reefs mill. The Zone A deposit is the better of the two and AngloGold estimated that subject to ore continuity, yet to be defined by grade control density drilling and the cost of relocating the adjacent Darwin gas pipeline, 18,000 oz gold may be economically mined. They estimated that the two deposits, at 0.7g/t cut off, contain a combined inferred resource of 1.26Mt @ 1.62g/t Au. (50,000oz) During the 2004-2005 report period the Burnside Joint Venture conducted an in-depth mining/geological review of the two deposits. In September 2005 an agreement was set in motion that would see Northern Gold NL acquire 100% of the Burnside JV assets. In turn, Northern Gold was subject to a friendly takeover by GBS Gold. During 2006, expenditure focused on developing sufficient gold ores from first rank deposits at Pine Creek. During 2007 the economics and feasibility of exploring and/or mining Target A, adjacent to the Darwin gas pipeline will be addressed. In the event of a favourable outcome, a programme of infill drill evaluation and trenching has been recommended. No field work was completed on ERL130 during the report period.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationGold resourcesen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationData compilationen_US
dc.titleAnnual exploration report for ERL 130 Esmeralda (Union Reefs Project) year ended 16 November 2006en_US
dc.relation.isatmap100Pine Creek 5270en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameBurrell Creek Formation, Mount Bonnie Formation, Cullen Batholithen_US
dc.description.mineprospectnameEsmeraldaen_US
dc.identifier.tenureERL130en_US
dc.description.modifyhistory07/12/2006en_US
dc.description.modifyhistory11/05/2017en_US
dc.description.modifyhistory24/05/2017en_US
dc.contributor.holderGBS Gold Australiaen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2006en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ERL130_2006_A.pdf339.37 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader