Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84239
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMcBain, Gen_US
dc.date.accessioned2017-02-02T22:49:11Z-
dc.date.issued2016en_US
dc.identifier.govdocCR2016-0593en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84239en_US
dc.description.abstractThe Napperby Project area, comprising Exploration Licence 24246 was located approximately 180 kilometres north-west of Alice Springs. EL 24246 was granted on 11 October 2004 to Paladin Resources NL for a period of 6 years. The tenement was subsequently transferred to Deep Yellow Ltd (DYL) in 2005. This report covers the twelfth and final year of tenure of EL 24246 consisting of 74 blocks covering a total area of 234 km2 and summarises work undertaken during the life of the tenement. Previously EL 24246 was reported together with EL 24606 in the Napperby Combined Report (GR081-09) for the period ending 27 November annually. EL 24606 was allowed to expire at the end of its eighth year of term on 27 December 2013. In 2007 Toro Energy Limited (Toro) entered into an Earn-In Agreement with DYL to purchase 100% of the project based on an agreed JORC compliant resource to be outlined by Toro by July 2010, or based on a 6,000 tonne U3O8 JORC resource if purchased earlier. During 2007, Toro completed a program of 515 sonic core holes, 123 auger holes and 814 aircore holes followed in 2008 by a further 333 sonic core holes and 784 aircore holes. Assay data from both the 2007 and 2008 drilling programs were used to calculate a JORC Code Mineral Resource estimate of 3,351 tonnes of U3O8 (including 670 tonnes U3O8 previously outlined by DYL). The 2009 (and current) JORC Inferred Mineral Resource at Napperby is 9.34 million tonnes at 359 ppm U3O8 containing 3,351 tonnes of U3O8 (7.39 Mlb). Only 50% of the known mineralised area was redrilled and included in the JORC compliant resource. After three years of exploration Toro considered the financial terms of the Earn-In Agreement to be unfavourable and ultimately withdrew from the project after a Scoping Study was completed. The Scoping Study included baseline environmental, radiation and heritage studies and groundwater monitoring activities as a pre-cursor to a Pre-Feasibility Study. With the uranium spot price falling in the aftermath of the Fukushima incident in 2011, and its impact on the company's share price, DYL was obliged to rationalise its expenditure on this and other Australian projects. No on-ground work was conducted with DYL pursuing desktop evaluations of the previously completed geophysical surveys, with the aim of identifying further drill targets and commencing metallurgical investigations on stored drill samples whilst seeking to divest the project by way of outright sale or joint venture. Following a number of unsuccessful attempts to attract a suitable purchaser, DYL decided to allow Exploration Licence 24246 to expire at the end if its twelfth year of term, 10 October 2016.en_US
dc.subject.classificationUraniumen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationRegional geologyen_US
dc.subject.classificationPalaeoproterozoicen_US
dc.subject.classificationMesoproterozoicen_US
dc.subject.classificationGranitic rocken_US
dc.subject.classificationGraniteen_US
dc.subject.classificationGranite gneissen_US
dc.subject.classificationPalaeodrainageen_US
dc.subject.classificationMineralisationen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationAuger drillingen_US
dc.subject.classificationSonic drillingen_US
dc.subject.classificationAircore drillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationTrenchingen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationAerial geophysical surveysen_US
dc.subject.classificationAerial magnetic surveysen_US
dc.subject.classificationAerial radiometric surveyen_US
dc.subject.classificationGravity surveysen_US
dc.subject.classificationAerial EM surveysen_US
dc.subject.classificationMetallurgical trainingen_US
dc.subject.classificationScoping studiesen_US
dc.subject.classificationMineral resourcesen_US
dc.subject.classificationRehabilitationen_US
dc.titleEL 24246 Napperby Project Annual and Final report 11 October 2004 to 10 October 2016en_US
dc.relation.isatmap100Napperby 5452en_US
dc.relation.isatmap100Mount Wedge 5352en_US
dc.relation.isatmap250Napperby SF5309en_US
dc.relation.isatgeolprovinceArunta Regionen_US
dc.relation.isatgeolprovinceAileron Provinceen_US
dc.description.mineprospectnameNapperbyen_US
dc.identifier.tenureEL24246en_US
dc.description.publicnotesSee previous annual reports for relevant dataen_US
dc.description.modifyhistory13/12/2016en_US
dc.description.modifyhistory03/02/2017en_US
dc.contributor.holderDeep Yellowen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2016en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24246_2016_S.pdf465.14 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader