dc.contributor.authorShaw, Jen_US
dc.date.accessioned2017-02-02T00:30:01Z-
dc.date.issued2005en_US
dc.identifier.govdocCR2005-0276en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84220en_US
dc.description.abstractThis is the second group annual report for the Pine Creek Gold Project. The project has been managed by Burnside Operations P/L on behalf of the Burnside Joint Venture since acquisition of the project in mid 2002. The parties to the joint venture are Territory Goldfields NL and Buffalo Creek Mines P/L which are subsidiaries of Northern Gold NL and Harmony Gold (Australia) Limited respectively. Initially, annual reports were written on an individual tenement anniversary basis. Group reporting was first approved for the 2003-2004 year. This current year also corresponds with the second anniversary of EL 23583 which shares a common report due date with the other tenements in the group. The Pine Creek Goldfield, discovered in 1869, was initially the scene of intensive alluvial and bedrock mining between 1894 and 1915. It is situated within metasediments of Lower Proterozoic age that have been tightly folded within the tectonic corridor of the Pine Creek Shear Zone. The host sediments, of greywacke-siltstone-mudstone facies have been metamorphosed to spotted phyllitic hornfels by the adjacent and subjacent Cullen Batholith. Bedrock gold mineralisation was initially exploited by shallow shafts, adits and drives. This work was focused on rich oxidised quartz-sulphide veins in the axial zone of shallow southeast-plunging anticlinal folds. From the late 1980s the area was the subject of intensive exploration and open pit mining until closure of the Renison Group mining and milling operation in 1995. Following closure the plant was sold and the area rehabilitated. The flagship mine, the Enterprise pit, was filled with water from Pine Creek while the other shallow pits were variably backfilled with rock waste. Waste dumps and heap leach sites were contoured, seeded and tailings areas sheeted. A vigorous acacia understorey has re established. By the close of mining in 1994 close to 12Mt of open pit ore had been treated for the recovery of 744,000oz gold. Following acquisition by the Burnside Joint Venture a data acquisition and drilling database review was conducted to begin the quantification of residual gold ores within the project area using 3D computer modelling of the host geology. During the year ended 15th July 2005 the joint venture carried out programs of RC exploratory drilling to outline potential ores for treatment at the Union Reefs mill, the latter having been purchased by the joint venture in August 2004. Both bedrock mineralisation and low grade waste dumps were tested in the program which totalled 56 holes for 2,346m. The dumps tested gave disappointing results, while bedrock drilling identified mineralisation that allowed an update of the computer models. The Czarina primary mineralisation was subjected to metallurgical testing that suggested only 70% recovery was achievable from the transition to fresh material. An alluvial gold treatment agreement existed between the Burnside JV and a local prospector. During the year the activity ceased allowing rehabilitation within MCN 523 and MCN 1055. Expenditure on the group tenements during the year totalled $371,166.00. For the coming year it is proposed to spend a total of $266,000 on exploratory drilling. Within EL 23583 the company conducted a review and compilation of previous exploration work. It is apparent that the present location of the Stuart Highway and the Darwin Adelaide Railway reserve seriously impinge on the more prospective eastern half of the licence.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationGold resourcesen_US
dc.subject.classificationData processingen_US
dc.subject.classificationLiterature reviewsen_US
dc.subject.classificationQuartz veinsen_US
dc.subject.classificationMetallurgical testingen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationMineral resourcesen_US
dc.subject.classificationOre resourcesen_US
dc.titleAnnual exploration report Pine Creek Project Tenements Year ending 15 July 2005, EL 23583, MLN 13, MLN 1130, MCN 317, MCN 523, MCN 1054, MCN 1055, MCN 4072 and MCN 4074en_US
dc.relation.isatmap100Pine Creek 5270en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameBurrell Creek Formation, Mount Bonnie Formationen_US
dc.description.geochemicalsampling803 downhole assaysen_US
dc.description.drilling56 RC holes for 3,179 men_US
dc.description.mineprospectnameCzarinaen_US
dc.description.mineprospectnameEnterpriseen_US
dc.description.mineprospectnameGandys Hillen_US
dc.description.mineprospectnameMonarchen_US
dc.description.mineprospectnameCoxen_US
dc.description.mineprospectnameEleanor Leaseen_US
dc.description.mineprospectnameElsinoreen_US
dc.description.mineprospectnameKohinooren_US
dc.identifier.tenureEL23583en_US
dc.identifier.tenureMLN13en_US
dc.identifier.tenureMLN1130en_US
dc.identifier.tenureMCN317en_US
dc.identifier.tenureMCN523en_US
dc.identifier.tenureMCN1054en_US
dc.identifier.tenureMCN1055en_US
dc.identifier.tenureMCN4072en_US
dc.identifier.tenureMCN4074en_US
dc.description.modifyhistory11/11/2013en_US
dc.description.modifyhistory10/01/2017en_US
dc.contributor.holderTerritory Goldfieldsen_US
dc.contributor.holderBuffalo Creek Minesen_US
dc.contributor.holderBurnside Operationsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2005en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)