Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84207
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShaw, Jen_US
dc.date.accessioned2017-02-01T22:48:31Z-
dc.date.issued2005en_US
dc.identifier.govdocCR2005-0489en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/84207en_US
dc.description.abstractThe Esmeralda tenement (ERL130) is situated 170km SE of Darwin, NT, and 8km north east of Pine Creek. Burnside Operations P/L acquired the lease in August 2004 as part of the purchase of the Union Reefs mill and underlying tenement assets. The project assets had been previously owned by Acacia Resources and later AngloGold (Ashanti) Ltd, who carried out mining and milling operations at Union Reefs prior to closure in July 2003. At Esmeralda previous exploration by Cyprus Gold Corporation and Acacia Resources had outlined two significant adjacent and sub parallel gold resources (A and B) some 4km south of the Union Reefs mill. The Zone A deposit is the better of the two and AngloGold estimated that subject to ore continuity, yet to be defined by grade control density drilling and the cost of relocating the adjacent Darwin gas pipeline, 18,000oz gold may be economically mined. They estimated that the two deposits, at 0.7g/t cut off, contain a combined inferred resource of 1.26Mt @ 1.62g/t Au. (50,000oz). During the report period the Burnside Joint Venture conducted an in-depth mining/geological review of the two deposits. Together with reporting, this work was costed at $10,575.00. This study by B.Makar is appended. In September 2005 an agreement was set in motion that would see Northern Gold NL acquire 100% of the Burnside JV assets. In turn, Northern Gold was subject to a friendly takeover by GBS Gold. The outcome of this consolidation is anticipated to be more favourable for a Union Reefs mill start up in the short term. In the following year, 2006, it is expected expenditure will focus on developing sufficient gold ores from first rank deposits at Pine Creek and Burnside with a view to initiating a mill start-up. At Esmeralda the economics and feasibility of exploring and/or mining Target A, adjacent to the Darwin gas pipeline will be addressed. In the event of a favourable outcome, a program of infill drill evaluation and trenching has been recommended.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationData compilationen_US
dc.subject.classificationResource assessmenten_US
dc.title12th Annual exploration report ERL 130 Esmeralda Year ended 16 November 2005en_US
dc.relation.isatmap100Pine Creek 5270en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameBurrell Creek Formation, Mount Bonnie Formation, Cullen Batholithen_US
dc.description.geochemicalsamplingdownhole geochem from dozens of previous drillholesen_US
dc.description.drillingdigital compilation of previous drillingen_US
dc.description.mineprospectnameEsmeraldaen_US
dc.identifier.tenureERL130en_US
dc.description.modifyhistory11/11/2013en_US
dc.description.modifyhistory10/01/2017en_US
dc.contributor.holderBurnside Operationsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2005en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
ERL130_2005_A_01.pdf193.58 kBPDF Add
ERL130_2005_A_02_Union_location.pdf21.22 kBPDF Add
ERL130_2005_A_03_Union_Setting.pdf6.25 MBPDF Add
ERL130_2005_A_04_ZoneA_gasline_plan.pdf21.21 kBPDF Add
CR2005-0489_Makar_2005_review.zip81.33 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader