Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83708
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Tennant, T | en_US |
dc.date.accessioned | 2016-11-17T23:22:06Z | - |
dc.date.issued | 2004 | en_US |
dc.identifier.govdoc | CR2004-0563 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83708 | en_US |
dc.description.abstract | During this period the project has moved to a feasibility stage and work was focused on advancing that study including, hydrology, aerial survey, resource modeling, mine planning and scheduling, metallurgical work, plant design, rail freight negotiations, environmental approvals, completing mining and land access agreements with the NLC on behalf of the Native Title Claimants, haul road designs and port arrangements. A final feasibility documents was drafted during the period and completed after the end of this period. The feasibility report is included in this report. An infill drilling program of 78 drill holes for 2259 metres was completed. | en_US |
dc.subject.classification | Manganese deposits | en_US |
dc.subject.classification | Manganese ores | en_US |
dc.subject.classification | Mine evaluation | en_US |
dc.subject.classification | Mine exploration | en_US |
dc.subject.classification | Resource assessment | en_US |
dc.subject.classification | Native title | en_US |
dc.subject.classification | Land access | en_US |
dc.subject.classification | Feasibility studies | en_US |
dc.subject.classification | Hydrology | en_US |
dc.subject.classification | Geophysical surveys | en_US |
dc.subject.classification | Aerial surveys | en_US |
dc.subject.classification | Drilling | en_US |
dc.subject.classification | Drill holes | en_US |
dc.subject.classification | Assaying | en_US |
dc.subject.classification | Assay value | en_US |
dc.subject.classification | Mine planning | en_US |
dc.subject.classification | Metallurgy | en_US |
dc.subject.classification | Pits | en_US |
dc.subject.classification | Plant design | en_US |
dc.title | Annual report for EL 10412 for period ending 31 August 2003 | en_US |
dc.relation.isatmap100 | Brunchilly 5760 | en_US |
dc.relation.isatmap250 | Helen Springs SE5310 | en_US |
dc.relation.isatgeolprovince | Tennant Region | en_US |
dc.description.stratname | Tennant Creek Suite | en_US |
dc.description.geochemicalsampling | Downhole assays | en_US |
dc.description.drilling | 78 Drill holes for 2259 meters | en_US |
dc.description.mineprospectname | Bootu Creek Deposit | en_US |
dc.identifier.tenure | EL10412 | en_US |
dc.description.modifyhistory | 16/03/2006 | en_US |
dc.contributor.holder | Bootu Creek Resources | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR2004 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR2004-0563_Exploration_Programme_Year4-EL10412.pdf | 70.72 kB | Add | |
CR2004-0563_Third_Report_10412.zip | 145.39 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.