Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83572
Export to Endnote
Title: | EL 24992 Mamadawerre Project Annual report 2 September 2013 to 1 September 2014 |
Title Holder / Company: | Cameco Australia Northern Prospector |
Report id: | CR2014-0776 |
Tenure: | EL24992 |
Year: | 2014 |
Abstract: | This report documents exploration work conducted during the sixth year of tenure. Exploration for unconformity style uranium mineralisation consisted of helicopter-supported outcrop sampling and reconnaissance work, soil sampling, acquisition of high resolution aerial imagery and establishing a 28 km access track into the tenement area to allow further cost effective exploration. A total of 71 rock samples and 30 soils have been collected within this reporting period. Due to the seasonally restricted field program, the reporting cut-off date for this project has fallen mid program with the program expected to be complete by late October. |
Date Added: | 8-Nov-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24992_2014_A_01.pdf | 2.81 MB | Add | |
EL24992_2014_A_02_APPENDIX1.pdf | 2.86 MB | Add | |
EL24992_2014_A_03_APPENDIX2.pdf | 314.25 kB | Add | |
EL24992_2014_A_04_APPENDIX3.pdf | 2.86 MB | Add | |
EL24992_2014_A_05_APPENDIX4.pdf | 268.3 kB | Add | |
EL24992_2014_A_06_ROCK2014A.txt | 22.52 kB | Text | Add |
EL24992_2014_A_07_SOIL2014A.txt | 11.07 kB | Text | Add |
EL24992_2014_A_08_SGEO2014A.txt | 12.96 kB | Text | Add |
EL24992_2014_A_09_Verification_List_2014.txt | 1.22 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.