Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83320
Export to Endnote
Title: | Final report for EL 2369 Mt Ptilotus for the period 25 March 1988 to 2 April 2003 Tanami Project |
Title Holder / Company: | Newmont Tanami |
Report id: | CR2003-0264 |
Tenure: | EL2369 |
Year: | 2003 |
Author: | Walter, M |
Abstract: | The report contains details on exploration carried out during the licence life (1988-2003). Work included sampling programs , drilling and aerial and ground geophysical surveys. Several targets were identified and followed up by further investigations. During the 2002 field season 838m of RAB in 16 holes was drilled. This program was designed to determine the source of gold values found in soil samples collected in previous years. No intersection of gold mineralisation considered to be economic has been found. |
Date Added: | 22-Sep-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL2369_2003_AS.pdf | 88.8 MB | Add | |
CR2003-0264_Appendix1.zip | 1.13 MB | ZIP | Add |
CR2003-0264_Geophysics.zip | 362.29 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.