Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83279
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBoots, MKen_US
dc.date.accessioned2016-09-19T00:45:48Z-
dc.date.issued2003en_US
dc.identifier.govdocCR2003-0314en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83279en_US
dc.description.abstractA proposal to undertake a regional airborne EM survey to be part of a follow-up programme of the Mount Fitch South prospect was abandoned when suitable joint venture funding could not be concluded. As part of this plan, the previous ground EM was modelled to determine the effectiveness of alternate methods. This work concluded that the fixed wing Tempest method would suitable. The report on this modelling is appended. All existing exploration and drill data was re-evaluated from the Mount Fitch area, to establish why previous intense uranium exploration programmes had failed to locate the Mount Fitch South mineralisation. It was concluded that intense leaching had occurred in the oxide zone of the mineralisation, and as such, only subtle geochemical anomalism occurs in RAB or aircore holes drilled in this zone. Three follow up drill holes were planned to further evaluate the Mount Fitch South prospect, however these were deferred to early in the 2004 field season. As part of this planning some grid rehabilitation was undertaken, and the location of the ground EM conductor was flagged. Existing drill data in the vicinity of the prospect was entered into a database to allow further investigation to be undertaken should new drill results prove positive.en_US
dc.subject.classificationMagnesiteen_US
dc.subject.classificationBase metalsen_US
dc.subject.classificationRegional geologyen_US
dc.subject.classificationGeneral geologyen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationGeological interpretationen_US
dc.subject.classificationDatabase validationen_US
dc.subject.classificationGeophysical interpretationen_US
dc.titleAnnual report of exploration ERL 125 Mt Fitch for the year ending 22 August 2003en_US
dc.relation.isatmap100Bynoe 5072en_US
dc.relation.isatmap100McKinlay River 5271en_US
dc.relation.isatmap250Darwin SD5204en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameCrater Formation, Coomalie Dolomite, Whites Formationen_US
dc.description.mineprospectnameMount Fitchen_US
dc.description.mineprospectnameBlueys Magnesiteen_US
dc.identifier.tenureERL125en_US
dc.description.modifyhistory07/02/2005en_US
dc.description.modifyhistory29/08/2016en_US
dc.contributor.holderCompass Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2003en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
Appendix2_ERL125_drill_location.xls53.5 kBMicrosoft Excel Add
Appendix3_ERL125_assays_09.2003.xls524.5 kBMicrosoft Excel Add
ERL125_2003_A.pdf255.07 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader