Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81280
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRohde, Jen_US
dc.date.accessioned2016-02-04T22:50:17Z-
dc.date.issued2015en_US
dc.identifier.govdocCR2015-0629en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81280en_US
dc.description.abstractThe relinquished area of EL 29368 formed part of the ABM Resources NL (ABM) Bonita project which comprises Exploration Licenses 29367, 29368, 23926 and 23927 (Figure 1). On 20th August 2012 the amalgamated technical reporting for Bonita was approved and the group reporting ID GR 253/12 assigned. ABM explores the tenement for the potential of gold mineralisation. In 2012 ABM applied for the tenements for their strategic position along strike of its holdings of the mineralised Reynolds Range corridor, and its interpreted similar geology. In 2013, work completed consisted of regional desktop studies, including geophysical and geological interpretations which resulted in the planning and completion of an airborne electromagnetic (AEM) survey over two of the project tenements [EL 23926 and 29368] and two surface sampling programs. None of the surface sampling covered the relinquished area. In 2014 and 2015 as ABM's focus turned to development the Old Pirate project no exploration was conducted; but as part of ABM's strategy to ensure exploration of its tenement portfolio, ABM negotiated an agreement in late 2013 whereby Clancy Exploration Limited (Clancy) had an option to acquire the North Arunta project tenements. Clancy commenced a pre-acquisition, substantial program of compilation and re-processing of potential field datasets covering an Area of Influence in the Tanami - North Arunta region, which includes the Bonita project. This work was undertaken by Fathom Geophysics. Clancy was unable to complete a capital raising to fund exploration and was therefore unable to meet the conditions precedent and had to withdraw from the agreement to acquire the North Arunta tenement package. Following the withdrawal of Clancy, ABM was not in a position to undertake any exploration on the Bonita project during the 2014 field season. Further expressions of interest were sought for joint venture of the North Arunta project tenements. Whilst there was some interest nothing had eventuated at the time when writing this report. Consequently ABM was required to a 'block reduction for non-compliance with expenditure covenant'. This resulted in the relinquishment of 18 blocks of the 247 - a 7.3% reduction of the EL 29368 tenement area. The relinquished areas of EL 29368 were selected due to the lack of significant magnetic features which warranting follow up work and the absence of geochemical results plus the improbability of upgrading the prospectivity with additional sampling.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationAerial geophysical surveysen_US
dc.subject.classificationAerial EM surveysen_US
dc.subject.classificationGeophysical interpretationen_US
dc.subject.classificationGeological interpretationen_US
dc.titlePartial relinquishment report for EL 29368 Bonita Project from 11 April 2012 to 7 September 2015en_US
dc.relation.isatmap100Turners Dome 5254en_US
dc.relation.isatmap100Giles 5354en_US
dc.relation.isatmap250Mount Theo SF5208en_US
dc.relation.isatmap250Mount Peake SF5305en_US
dc.relation.isatgeolprovinceArunta Regionen_US
dc.relation.isatgeolprovinceAileron Provinceen_US
dc.description.stratnameHatches Creek Groupen_US
dc.identifier.tenureEL29368en_US
dc.description.publicnotesSee CR2013-0105 for Aerial EM Surveyen_US
dc.description.modifyhistory06/11/2015en_US
dc.description.modifyhistory19/09/2017en_US
dc.contributor.holderABM Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2015en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29368_2015_P.pdf34.94 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader