Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81028
Export to Endnote
Title: Annual Report for MCCs 315, 348-351,888-895, 904-906, 969-972, 981-982 and MLCs 20, 328-337, 693 for the period 26 March 1999 to 25 March 2000 Tennant Creek District, Northern Territitory Camelot Central Joint Venture 2, Occidental Reporting Group
Title Holder / Company: Normandy Tennant Creek
PacMin Mining
Normandy NFM
Report id: CR2000-0233
Tenure: MLC20;  MLC328;  MLC329;  MLC330;  MLC331;  MLC332;  MLC333;  MLC334;  MLC335;  MLC336;  MLC337;  MLC693;  MCC315;  MCC348;  MCC349;  MCC350;  MCC351;  MCC888;  MCC889;  MCC890;  MCC891;  MCC892;  MCC893;  MCC894;  MCC895;  MCC904;  MCC905;  MCC906;  MCC969;  MCC970;  MCC971;  MCC972;  MCC981;  MCC982
Year: 2000
Author: Orton , V
Abstract: Work carried out during the reporting period includes RC and diamond drilling at Pinot prospect and modelling of the 1998 magnetic survey data. Drilling results at Pinot have downgraded the prospect. At Olivewood and 102 prospects four magnetic ironstone modelled bodies were interpreted. The most prospective, untested exploration target is the ironstone beneath the 102 workings. Due to higher priority targets elsewhere, no drill testing is planned for the next year of tenure.
Date Added: 5-Jan-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20000233.pdf7.23 MBPDF Add
CR2000-0233_Drilling.zip15.39 kBZIP Add
CR2000-0233_Geophysics.zip391.52 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader