Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80451
Export to Endnote
Title: EL 28218 East Arnhem Land Annual report for the period 28 March 2012 to 27 March 2013
Title Holder / Company: Enigma Mining
TNG
Report id: CR2013-0331
Tenure: EL28218
Year: 2013
Author: Wetherley, C
Abstract: The introduction of a new Exploration Manager in mid-2012 resulted in the review of all projects. The review process involved the production of base maps and databases of historical data for each project. The 1:10,000 A0 base maps, with topographic and geological backgrounds, for the EL 28218. These maps are designed to be able to be used as a base for compilation of data in the field, with locations easily identifiable at the scale used. All historical geochemical and diamond sampling data from the STRIKE system falling within EL 28218 and EL 28219 has been compiled into Excel Databases containing the relevant location and assay data, where available.
Date Added: 16-Aug-2015
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28218_2013_A.pdf4.15 MBPDF Add
CR2013-0331_Appendix1.zip5.69 kBZIP Add
CR2013-0331_Appendix2.zip1.81 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader