Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80205
Export to Endnote
Title: | Harts Range 2 Project EL 25453 Annual technical report for period 12 March 2008 to 11 March 2009 |
Title Holder / Company: | Mithril Resources |
Report id: | CR2009-0165 |
Tenure: | EL25453 |
Year: | 2009 |
Author: | Rich, B |
Abstract: | Results from the geological mapping and rock chip sampling were very encouraging. Field checking confirmed prospective mafic intrusives outcrop within the tenement. Additionally elevated nickel, copper and cobalt assays were returned from a number of rock chip samples. |
Date Added: | 27-Jul-2015 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25453_2009_A.pdf | 438.06 kB | Add | |
CR2009-0165_Appendices.zip | 2 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.