Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79482
Export to Endnote
Title: | Palm Valley 2 Downhole Flow Reconfiguration Drill Collar Perforation Report |
Title Holder / Company: | Magellan Petroleum |
Report id: | PR1970-0026 |
Tenure: | OP175 |
Year: | 1995 |
Corporate Author: | Magellan Petroleum (NT) |
Drillhole/Well Name: | Palm Valley 2 |
Rig release date: | 05/02/1970 |
Document Type: | Engineering Report |
Date Added: | 9-Jan-2015 |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR1970-0026_PV2_DownholeFlowReconfiguration_DrillCollarPerforationReport_Oct1995.pdf | 1.08 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.