Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79076Export to Endnote
| Title: | Annual report 1993 Redbank Copper District MLN 631 to MLN 636, MLN 1108, ERL 94 |
| Title Holder / Company: | Redbank Copper |
| Report id: | CR1994-0078 |
| Tenure: | ERL94; MLN631; MLN632; MLN633; MLN634; MLN635; MLN636; MLN1108; MLC340C; MLC341C; MLC342C; MLC343C; MLC344C; MLC345C |
| Year: | 1993 |
| Author: | McGarry, G |
| Abstract: | Work completed during this anniversary period included the completion of a preliminary environmental report, metallurgical testwork and the drilling of 9 production and observation bores. A submission to construct a flotation mill for treatment of copper sulphide ore liberated from an 80 m open cut at Sandy Flat was completed. A soil gas survey was undertaken, which was successful over Sandy Flat, but it was impractical at Bluff. Final metallurgical test work indicated that a blend of oxide transitional and sulphide ore would produce satisfactory recoveries into acceptable grade concentrates. Site works commenced in September 1993. |
| Date Added: | 2-Dec-2014 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| CR19940078_1993_GA.pdf | 371.33 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.