Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79065
Export to Endnote
Title: | EL 6307 Final report for the period 16 November 1988 to 24 December 1993 Mount Strzelecki Prospect |
Title Holder / Company: | Poseidon Gold Normandy Exploration Yuendumu Mining Company |
Report id: | CR1994-0249 |
Tenure: | EL6307 |
Year: | 1993 |
Author: | Kuoni, J |
Abstract: | During the period of the licence, 3220 soil samples have been collected as well as the completion of 1346 vacuum holes (5529m), 40 RAB (1274m), 35 RC (1970m) and 3 diamond collars (131.5m). In addition there has been the acquisition and interpretation of airborne magnetics, TM Imagery, aerial photography and ground magnetics. Drilling returned some ore grade intercepts at C5 including 12m at 3.55g-t Au, 6m at 25.0g-t Au and 6m at 9.5g-t Au. Vacuum drilling at Tiptoe and C5 extension have returned anomalous values. Drilling at NW Petracks has returned values of 3m at 2.3g-t Au and 6m at 1.55g-t Au. |
Date Added: | 1-Dec-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL6307_1993_S.pdf | 6.54 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.