Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78991
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDunster, Jen_US
dc.date.accessioned2014-11-25T00:39:36Z-
dc.date.issued2014en_US
dc.identifier.govdocCR2014-0579en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78991en_US
dc.description.abstractIn May 2007, Rum Jungle Resources Ltd purchased EL 24917 and other ELs from Wasabi in consideration of shares and share options. Rum Jungle Resources Ltd was primarily targeting uranium and base metals (principally copper and iron). PGEs, silver, nickel, gold were considered secondary targets. Several geophysical surveys and numerous rounds of surface sampling were undertaken under Rum Jungle Resources' operatorship. In all for the life on the EL, including areas previously relinquished, 188 rockchip samples and 56 closely-spaced soil samples on three lines have been taken and have their laboratory assays reported here. This includes a few surface samples that plot just over the boundary on the adjacent Rum Jungle Resources EL 28156. Handheld XRF was used extensively during Year 3 of tenure, both in the field and to analyse samples back in the office. These results are considered qualitative only and not given in this report. Prospects on EL 24917 have also been intensively drilled, starting with eight holes at Tommys Gap prospect. In 2008, Year 3 of tenure, thirty RAB holes were drilled for 841 m at the M23 prospect. In Year 7 of tenure, the Cleary Dam Cu-Ni-PGE prospect was tested with two angled RC holes and four more angled RC holes were drilled at Tommys Gap prospect, bringing the total there to 12. No economic mineralisation was intersected. The Mulga Dam 1 uranium target which straddles the boundary of EL 24917 and former EL 28334 was identified on radiometrics acquired for Rum Jungle Resources. This target was drill tested with three RC holes on each EL. No significant mineralisation was intersected on EL 24917 or EL 28334 and no further work was warranted at Mulga Dam 1. In all during the life of EL 24917, including areas previously relinquished, 49 holes were drilled for 2,437 m, averaging 49.7 m deep. A remote sensing study and reinterpretation of geophysical data failed to identify any new leads. The EL was retained into Year 8 and 9 only to complete rehabilitation. This included removal of several truck-loads of rubbish from former operators and prospectors. All rehabilitation and remediation was undertaken as planned in 2013 and completed in the first half of 2014, along with checks of previous rehab. EL 24917 was surrendered in full.en_US
dc.subject.classificationUraniumen_US
dc.subject.classificationBase metalsen_US
dc.subject.classificationCopperen_US
dc.subject.classificationNickelen_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationSilveren_US
dc.subject.classificationIronen_US
dc.subject.classificationPlatinum group elementsen_US
dc.subject.classificationPhysiographyen_US
dc.subject.classificationGeologyen_US
dc.subject.classificationExploration rationaleen_US
dc.subject.classificationExploration historyen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationAerial geophysical surveysen_US
dc.subject.classificationAerial magnetic surveysen_US
dc.subject.classificationAerial radiometric surveyen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationRAB drillingen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationGeochemical explorationen_US
dc.subject.classificationX ray fluorescence spectrometersen_US
dc.subject.classificationRock chip samplingen_US
dc.subject.classificationSoil samplingen_US
dc.subject.classificationAssay valueen_US
dc.subject.classificationRehabilitationen_US
dc.subject.classificationInterpretationen_US
dc.subject.classificationPetrologyen_US
dc.titleEL 24917 Final annual and surrender reporten_US
dc.relation.isatmap100Fergusson Range 5850en_US
dc.relation.isatmap250Alice Springs SF5314en_US
dc.relation.isatgeolprovinceArunta Regionen_US
dc.relation.isatgeolprovinceAileron Provinceen_US
dc.relation.isatgeolprovinceAmadeus Basinen_US
dc.description.geochemicalsampling56 Soil samplesen_US
dc.description.geochemicalsampling188 Rock chip samplesen_US
dc.description.drilling17 RC holes for 1,581 m (CDRC001, CDRC002, MURC001, MURC002, MURC003, TGRC001 to TGRC012)en_US
dc.description.drilling32 RAB holes for 856 m (ARRA001, ARRA011)RRRA001 to RRRA030)en_US
dc.description.mineprospectnameTommys Gapen_US
dc.description.mineprospectnameCleary Dam Cu-Ni-PGEen_US
dc.description.mineprospectnameM23en_US
dc.identifier.tenureEL24917en_US
dc.description.publicnotesAdditional geophysics datasets are available on requesten_US
dc.description.modifyhistory03/10/2014en_US
dc.description.modifyhistory21/11/2014en_US
dc.description.modifyhistory22/02/2016en_US
dc.description.modifyhistory08/06/2017en_US
dc.description.modifyhistory19/09/2017en_US
dc.contributor.holderRum Jungle Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2014en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24917_2014_AS.pdf4.58 MBPDF Add
CR2014-0579_Data.zip211.37 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader