Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78351
Export to Endnote
Title: | Fifth annual report over the EL 26073 Arnold Uranium Project |
Title Holder / Company: | Diamantina Uranium |
Report id: | CR2013-0344 |
Tenure: | EL26073 |
Year: | 2013 |
Author: | Kastellorizos, P |
Abstract: | During November 2012 consulting geologists Kastellco Geological Consultancy (KGC) conducted a review of existing historical exploration data within the Northern Territory Geological Survey Database. This was conducted for all the Project area to identify any high potential base metal and uranium exploration targets and resulted in the identification of several targets that warrant further work. |
Date Added: | 4-Aug-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26073_2013_A.pdf | 697.19 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.