Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78291
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPearse, CDFen_US
dc.date.accessioned2014-06-25T05:42:15Z-
dc.date.issued1990en_US
dc.identifier.govdocCR1990-0563en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78291en_US
dc.description.abstractDuring the 1989-90 financial year 2,554,808 BCM of material was mined. Mining work involved blasting, pit slope stability, tailings dam Construction and milling. A total of 1,133,976 tonnes of ore totalling 2.66 grams per tonne gold was treated in the CIP circuit yielding 2,304kg gold and 721.4kg silver. The average gold recovery was 77.2 percent. Heap leaching saw 551,002 tonnes of ore crushed yielding 325.2kg of gold. Exploration at North Enterprise involved the drilling of 29 percussion holes to the base of oxidation across the axis of the enterprise anticline. Assay results were generally disappointing with the majority being less than 0.5 grams per tonne Au. Some spotty grades were obtained from the western limb and close to the anticlinal axis indicating minimal potential for bulk oxide ore but some potential for leachable material. A total of 4 diamond drill holes were drilled at the south-east Enterprise for the purpose of determining the position of the Enterprise syncline, and to gain a better understanding of the structure and stratigraphy in this area. The syncline was found to pass out of the pit and continues south where it crosses the Stuart highway. Ten diamond holes were drilled at the South Enterprise designed to intersect down plunge mineralisation of the Enterprise saddle reef system and to define the structure and lithology in this area. Evidence from this programme indicates there is a significant increase in the plunge of the anticlinal axis increases from 11300N. This has been caused by the effect of South Enterprise Fault. At the Czarina Anticline 9 diamond holes were drilled along to test the East limb of the structure, and RC and percussion drilling were used to evaluate the potential Au resource in both the oxide and primary zones. At the southern end of the anticline there is only the possibility of a low grade marginal resource in the oxide. At the northern end of the structure there is a resource of 850,000 t at 1.7 grams per tonne in the oxide zone and 1,400,000 t at 2.1 grams per tonne in the primary zone. Percusion drilling at Eleanor proved inconclusive but did demonstrate the highly patchy nature of gold occurrences. This was followed by diamond drilling which revealed visible gold within quartz veins in the grit-greywacke sequence.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationGold depositsen_US
dc.subject.classificationMiningen_US
dc.subject.classificationBlastingen_US
dc.subject.classificationTailings damsen_US
dc.subject.classificationPlant operationsen_US
dc.subject.classificationHeap leachingen_US
dc.subject.classificationRehabilitationen_US
dc.subject.classificationSafetyen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationPercussion drillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationRC drillingen_US
dc.titleAnnual report MLN 13, 1 July 1989 to 30 June 1990en_US
dc.relation.isatmap100Pine Creek 5270en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameMount Bonnie Formationen_US
dc.description.stratnameBurrell Creek Formationen_US
dc.description.geochemicalsamplingdrill cuttings samplingen_US
dc.description.drilling29 percussion drill holes-North Enterpriseen_US
dc.description.drilling4 diamond drill holes totalling 220m-South East Enterpriseen_US
dc.description.drilling10 diamond drill holes totalling 1,972m-South Enterpriseen_US
dc.description.drilling11 diamond drill holes-Czarina Anticlineen_US
dc.description.drilling8583m RC drilling-Czarina anticlineen_US
dc.description.drilling3314m of percussion drilling-Czarina anticlineen_US
dc.description.drilling30 percussion drill holes-Eleanoren_US
dc.description.drilling7 diamond drill holes-Eleanoren_US
dc.description.mineprospectnameNorth Enterpriseen_US
dc.description.mineprospectnameSouth East Enterpriseen_US
dc.description.mineprospectnameCzarinaen_US
dc.description.mineprospectnameSouth Enterpriseen_US
dc.description.mineprospectnameEleanoren_US
dc.identifier.tenureMLN13en_US
dc.description.modifyhistory14/07/2008en_US
dc.description.modifyhistory02/10/2003en_US
dc.description.modifyhistory30/03/2005en_US
dc.description.modifyhistory25/07/2005en_US
dc.description.modifyhistory30/05/2014en_US
dc.description.modifyhistory09/02/2015en_US
dc.contributor.holderPine Creek Goldfieldsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR1990en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19900563.pdf485.41 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader