Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78092
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorCarville, DPen_US
dc.contributor.authorRayner, Jen_US
dc.date.accessioned2014-06-18T05:21:57Z-
dc.date.issued1989en_US
dc.identifier.govdocCR1989-0548en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78092en_US
dc.description.abstractEL 4196 has been held and operated under several names and JVs. The EL had been reduced to two blocks covering 6 km2 when BHP Gold entered into an agreement with Biddlecombe and Biddlecombe applied for ERL 88. Work carried out includes mapping and sampling of existing costeans and 1947 m of new costeans, 32 percussion holes, 11 RC holes and three diamond drillholes. All prevous work is reviewed.en_US
dc.subject.classificationGolden_US
dc.subject.classificationReviewsen_US
dc.subject.classificationMappingen_US
dc.subject.classificationCosteaningen_US
dc.subject.classificationSoil samplingen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationPercussion drillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationWater bore drillingen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill core analysisen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationAssay valueen_US
dc.subject.classificationQuartz veinsen_US
dc.subject.classificationSulphide mineralsen_US
dc.titleFinal report Mount Shoobridge EL 4196en_US
dc.relation.isatmap100Tipperary 5170en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.geochemicalsamplingcostean, surface and downhole samplesen_US
dc.description.drilling1 Waterbore hole for 41.5 m (MSWD 1)en_US
dc.description.drilling3 Diamond holes for 212 m (MSDDH 1, MSDDH 2, MSDDH 3)en_US
dc.description.drilling11 RC holes for 621 men_US
dc.description.drilling32 Percussion holes for 1,558 m (MSPDH 1 - MSPDH 31)en_US
dc.description.mineprospectnameMount Shoobridge Prospecten_US
dc.identifier.tenureEL4196en_US
dc.description.publicnotesData incompleteen_US
dc.description.modifyhistory02/10/2003en_US
dc.description.modifyhistory10/02/2005en_US
dc.description.modifyhistory06/02/2005en_US
dc.description.modifyhistory27/11/2006en_US
dc.description.modifyhistory03/01/2014en_US
dc.description.modifyhistory13/01/2014en_US
dc.description.modifyhistory30/04/2014en_US
dc.description.modifyhistory12/08/2015en_US
dc.contributor.holderBiddlecombe, RMen_US
dc.contributor.holderBHP Gold Minesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR1989en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19890548.pdf2.8 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader