Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78006
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Pease, CFD | en_US |
dc.date.accessioned | 2014-04-14T04:10:34Z | - |
dc.date.issued | 1988 | en_US |
dc.identifier.govdoc | CR1988-0365 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78006 | en_US |
dc.description.abstract | Work during the 1986 and 1987 year consisted of diamond and percussion drilling in the immediate pit area and on selected targets elsewhere on the lease. Three diamond drill holes were drilled within the pit area of the Enterprise Anticline in order to test the primary ore zone. In addition 4 diamond and 12 percussion drill holes were drilled on the adjacent syncline structure. In situ reserves as of January 1987 were estimated at 11.2 M tonnes averaging 2.6 grams per tonne Au, and mineable reserves were estimated at 9.2 M tonnes averaging 2.7 grams per tonne Au. This has also resulted in a redesign of the open cut, which would include part of the syncline structure. The Czarina anticline was drilled by 17 percussion and 5 diamond holes which confirmed the presence of low grade mineralisation on this structure within the Upper Mine Greywacke. At the Kohinoor anticline work involved detailed mapping of the underground workings, percussion drilling on the Kohinoor saddle reef and diamond drilling to test the geology and mineralisation at depth. The results indicate considerable potential in the area, but further drilling is required to resolve structural and stratigraphic complexities. Finally percussion drilling totalling 1134m was undertaken on selected targets within the Southern Mining Lease during 1986 and 1987. These areas were selected due to their potential to host small tonnages of ore with grades greater than Enterprise grades. the results did not reveal any significant high grade intersections. | en_US |
dc.subject.classification | Precious metals | en_US |
dc.subject.classification | Gold | en_US |
dc.subject.classification | Gold deposits | en_US |
dc.subject.classification | Grade control | en_US |
dc.subject.classification | Drilling | en_US |
dc.subject.classification | Diamond drilling | en_US |
dc.subject.classification | Percussion drilling | en_US |
dc.subject.classification | Drill hole data | en_US |
dc.subject.classification | Geochemical methods | en_US |
dc.subject.classification | Geochemical interpretation | en_US |
dc.subject.classification | Ore reserve estimation | en_US |
dc.subject.classification | Resource assessment | en_US |
dc.subject.classification | Geological mapping | en_US |
dc.subject.classification | Structural mapping | en_US |
dc.title | MLN 13 Pine Creek, Annual report for 1986 to 1987 | en_US |
dc.relation.isatmap100 | Pine Creek 5270 | en_US |
dc.relation.isatmap250 | Pine Creek SD5208 | en_US |
dc.relation.isatgeolprovince | Pine Creek Orogen | en_US |
dc.description.stratname | Burrell Creek Formation | en_US |
dc.description.stratname | Mount Bonnie Formation | en_US |
dc.description.mineprospectname | Enterprise | en_US |
dc.description.mineprospectname | Monarch | en_US |
dc.description.mineprospectname | Czarina | en_US |
dc.description.mineprospectname | Kohinoor | en_US |
dc.identifier.tenure | MLN13 | en_US |
dc.description.modifyhistory | 18/08/2014 | en_US |
dc.description.modifyhistory | 19/09/2023 | en_US |
dc.contributor.holder | Pine Creek Goldfields | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR1988 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19880365.pdf | 1.46 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.