Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77866
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMcKinnon-Matthews, WJen_US
dc.date.accessioned2014-03-25T05:24:47Z-
dc.date.issued2009en_US
dc.identifier.govdocCR2009-0095en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77866en_US
dc.description.abstractThis report presents the work completed during the seventh year of tenure on the Hammer Hill Project; a joint venture between Mithril Resources (manager), BHP Billiton and Arafura Resources. The project covers granted Exploration Licences EL 9725 and 10136, which have joint reporting status. The Hammer Hill Project area straddles the Huckitta and Illogwa Creek 250,000- scale map sheets and is centred about 180 km northeast of Alice Springs, south of the Plenty Highway. Work completed over the tenement area during the seventh year of tenure includes: A review of the final data from the VTEM survey; Heritage surveys; Ground EM (moving loop and fixed loop); Diamond drilling (3 drillholes); Petrography; Downhole EM; Geological mapping and rock sampling; and Planning of RAB/Aircore drilling. The diamond drilling intersected significant sulphide mineralisation including minor chalcopyrite. The style of mineralisation is thought to be that of a skarn type and conductive targets remain untested in the vicinity of the drilling. Aircore and / or RAB drilling is planned on a number of traverses to determine the source of other magnetic targets on the project.en_US
dc.subject.classificationNickelen_US
dc.subject.classificationChromiumen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationEM surveysen_US
dc.subject.classificationMoving Loop EM surveyen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationDiamond drillingen_US
dc.subject.classificationDrill collarsen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill hole dataen_US
dc.subject.classificationDown hole geophysicsen_US
dc.subject.classificationDrill core samplingen_US
dc.subject.classificationGeochemical explorationen_US
dc.subject.classificationGeochemical samplingen_US
dc.subject.classificationRock chip samplingen_US
dc.subject.classificationStream sediment samplingen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.subject.classificationPetrologyen_US
dc.titleAnnual report for EL 9725 and EL 10136 Hammer Hill Project 13 February 2008 to 12 February 2009en_US
dc.relation.isatmap100Quartz 5951en_US
dc.relation.isatmap100Dneiper 5952en_US
dc.relation.isatmap250Illogwa Creek SF5315en_US
dc.relation.isatmap250Huckitta SF5311en_US
dc.relation.isatgeolprovinceArunta Regionen_US
dc.relation.isatgeolprovinceAileron Provinceen_US
dc.relation.isatgeolprovinceIrindina Provinceen_US
dc.description.geochemicalsampling1 Stream sediment sampleen_US
dc.description.geochemicalsampling16 Rock chip samplesen_US
dc.description.geochemicalsampling228 Drill samplesen_US
dc.description.drilling3 Diamond holes for 819.3 m (HHDD001, HHDD002, HHDD003)en_US
dc.description.mineprospectnameHolsteinsen_US
dc.description.mineprospectnameHammer Hillen_US
dc.identifier.tenureEL9725en_US
dc.identifier.tenureEL10136en_US
dc.description.modifyhistory19/03/2009en_US
dc.description.modifyhistory05/06/2013en_US
dc.description.modifyhistory11/11/2013en_US
dc.description.modifyhistory07/02/2014en_US
dc.description.modifyhistory18/03/2014en_US
dc.description.modifyhistory30/08/2018en_US
dc.contributor.holderArafura Resourcesen_US
dc.contributor.holderMithril Resourcesen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2009en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR124-09_2009_GA.pdf220.36 kBPDF Add
CR2009-0095_Appendices.zip3.23 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader