Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77861
Export to Endnote
Title: | Partial reduction report for EL 27219 for period ending 3 November 2013 |
Title Holder / Company: | Tri-Star Energy Company |
Report id: | CR2013-1007 |
Tenure: | EL27219 |
Year: | 2013 |
Author: | Butler, J |
Abstract: | EL 27219 was granted 6 November 2009 for a term of five (5) years. Tri-Star Energy Company is the sole titleholder of EL 27219 and Tri-Star Coal Operations LLC is the operator of the tenure. EL 27219 is part of a group of licences (by way of combined technical reporting) assembled to create a large area that could feasibly be exploited as a coal project area. Tri-Star has spent considerable time investigating and re-analysing the seismic data and other geological and geophysical data over EL 27219 and the surrounding tenures in the Project Area. Office-based studies, have determined that it is unlikely that the coal seams do not extend to EL 27219 and therefore, Tri-Star has reduced approximately 50 per cent of EL 27219. No field work was conducted on the reduction area. |
Date Added: | 24-Mar-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27219_2013_P.pdf | 1.41 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.