Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77357
Export to Endnote
Title: | Year 3 Annual and final, Putta Putta EL 27840 |
Title Holder / Company: | Natural Resources Exploration |
Report id: | CR2013-0433 |
Tenure: | EL27840 |
Year: | 2013 |
Author: | Munro, N |
Abstract: | NRE's exploration rationale and objectives for its Putta Putta Prospect considered the evaluation of phosphate mineralisation. Investigations were intended to locate any possible areas of surface or shallow subsurface (<30m) mineralisation across the tenement. Based on the exploration activities conducted on EL 28740, NRE believes that no further exploration is warranted at this time. NRE made application to the Department to completely surrender the entire title for EL 27840 under section 103 of the Mineral Titles Act. EL 27840 was surrendered on 24 April 2013. NRE believes that there is no rehabilitation required in relation to EL 27840 as no field based activities have been undertaken within the tenure nor have any works involving land disturbance been carried out during the term of the licence. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27840_2013_AS.pdf | 1.57 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.