Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77129
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRicardo, Men_US
dc.date.accessioned2013-10-28T08:41:31Z-
dc.date.issued2012en_US
dc.identifier.govdocCR2012-0984en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77129en_US
dc.description.abstractThe Barkly Project, located approximately 66km east of Tennant Creek, is a sub-project of Vale's Georgina Phosphate Exploration Project and covers Cambrian rocks of the Georgina Basin. The rocks of the Georgina Basin range in age from Late Proterozoic to Early Palaeozoic. Outcrop within Barkly is limited with much of the basement geology concealed beneath Tertiary and Quaternary sediments. Drilling was completed on ELs 27198 and 27199 in 2011 and on ELs 27197 and 27200 in 2010. Surface sampling and mapping was completed in 2010. Phosphate exploration work on Barkly in 2012 consisted of focused drill targeting, 46.3km of line clearing, reconnaissance reverse circulation drilling, an environmental audit report and drill site and track rehabilitation of all disturbed sites. A Geophysical Basin Modelling Study done in 2011 was used in conjunction with 2011 drill results to gain a better understanding of the Georgina Basin and assist with phosphate drill targeting. In 2012, 21 RC drill holes were completed on EL27198, targeting phosphate highs from 2011, totalling 1544 m and gathering 769 2m composite with QA/QC samples. 2012 drilling outlined a 1% P2O5 body approximately 6 km by 9 km with high grade 9% of approximately 1 km by 6 km. The size of the resource was adequate however resource grade was much lower than a required average of 17% P2O5. For that reason the decision was made to surrender the Barkly project tenements.en_US
dc.subject.classificationPhosphate mineralsen_US
dc.subject.classificationPhosphate rocken_US
dc.subject.classificationPhosphatesen_US
dc.subject.classificationGeophysical modelsen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationRC drillingen_US
dc.subject.classificationDrill hole logsen_US
dc.subject.classificationDrill cuttings samplingen_US
dc.subject.classificationGeochemical explorationen_US
dc.subject.classificationGeochemical samplingen_US
dc.subject.classificationRock chip samplingen_US
dc.subject.classificationAssayingen_US
dc.subject.classificationAssay valueen_US
dc.titleCombined third annual and final report for the period 17 September 2009 to 2 November 2012, Barkly Project, ELs 27197, 27198, 27199, 27200en_US
dc.relation.isatmap100Dalmore 6058en_US
dc.relation.isatmap100Favenc 5958en_US
dc.relation.isatmap100Gosse River 5858en_US
dc.relation.isatmap100Barkly 5859en_US
dc.relation.isatmap100Frewena 5959en_US
dc.relation.isatmap250Alroy SE5315en_US
dc.relation.isatmap250Tennant Creek SE5314en_US
dc.relation.isatgeolprovinceGeorgina Basinen_US
dc.description.geochemicalsamplingRock chip samplesen_US
dc.description.geochemicalsampling410 RC drill samples from 2010en_US
dc.description.geochemicalsampling500 RC drill samples from 2011en_US
dc.description.geochemicalsampling769 RC drill samples from 2012en_US
dc.description.drilling37 RC holes for 3617 m (VGRC015 to VGRC021, VGRC073 to VGRC102)en_US
dc.identifier.tenureEL27197en_US
dc.identifier.tenureEL27198en_US
dc.identifier.tenureEL27199en_US
dc.identifier.tenureEL27200en_US
dc.description.publicnotesSee CSR0052 for water bore data.en_US
dc.description.modifyhistory03/01/2013en_US
dc.description.modifyhistory28/05/2013en_US
dc.description.modifyhistory24/09/2013en_US
dc.description.modifyhistory22/05/2014en_US
dc.description.modifyhistory21/11/2014en_US
dc.contributor.holderVale Australia EAen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2012en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR135-09_2012_GAS_01.pdf2.29 MBPDF Add
GR135-09_2012_GAS_02_App2_LogisticsSolution.pdf208.92 kBPDF Add
GR135-09_2012_GAS_03_App3_MiraModelling.pdf3.16 MBPDF Add
GR135-09_2012_GAS_04_2012DrillReport.pdf3.11 MBPDF Add
GR135-09_2012_GAS_09_2012QAQC.pdf303.62 kBPDF Add
CR2012-0984_Data.zip140.27 kBUnknown Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader