Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76990
Export to Endnote
Title: Annual and final report EL 26975, 23 July 2009 to 13 September 2012
Title Holder / Company: Fertoz
Report id: CR2012-0610
Tenure: EL26975
Year: 2012
Author: Szonyi, L
Abstract: Work conducted in the third year consisted of desk top studies and the submission of a Mine Management Plan for the Barrow Creek Project focussing initially on EL 26915. The exploration work done to date has not successfully explored EL 26975 for the presence of phosphate mineralisation. What limited work that has been done has proved that the transported soils effectively are geochemically blanketing the underlying rocks. The only effective way to examine the underlying strata is by drilling, firstly using either Aircore (recommended) or Reverse Circulation methods. Fertoz does not have the funds to carry out drilling in the next twelve months. It has given priority in the Barrow Creek project to EL 26915 which it has entered into a joint venture with NuPower Resources. While the tenement shows potential for Rare Earth Elements, it is not a focus for Fertoz. Consequently Fertoz has decided to relinquish EL 26975 and carry out no further exploration.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL26975_2012_AS_01.pdf4.96 MBPDF Add
EL26975_2012_AS_02_Geochem.txt27.33 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader