Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76901
Export to Endnote
Title: Partial relinquishment report Flemington EL 27640
Title Holder / Company: Natural Resources Exploration
Report id: CR2012-0369
Tenure: EL27640
Year: 2012
Author: Munro, N
Abstract: NRE?s exploration activities during the term of the permit and in particular, of the relinquished area, consisted of both office-based and field activities. An initial regional assessment of the areas within EL27640 and NRE?s South Nicholson Project for diamond and base metals was conducted during the initial term. The targets areas were identified based on desktop research of regional geological and geophysical data, augmented with compilation and assessment of all previous exploration results. The aim of work has been to carry out a field assessment of the prospects in order to identify target characteristics and define the next phase of exploration. An array of material was assessed prior to field work, to assist with optimal target generation. This material included an extensive review of historic exploration conducted over the relinquished area. There has been a number of previous exploration tenements over the subject relinquished area. In January 2011, the Department kindly allowed NRE to set-up in the Darwin Core Facility where NRE?s geologists undertook analysis of the water bore cuttings using a hand-held XRF device and re-logged water bores. One water bore was assayed from the relinquished area.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL27640_2012_P_01.pdf2.3 MBPDF Add
EL27640_2012_P_02_DrillLoc.txt1.62 kBText Add
EL27640_2012_P_03_DownholeGeoChem.txt5.76 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader