Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76547
Export to Endnote
Title: Relinquishment Report EL 24841 Murphy Project, NT 31 August 2011
Title Holder / Company: Murphy Uranium
Report id: CR2011-0745
Tenure: EL24841
Year: 2011
Author: Esser, D
Abstract: This relinquishment report describes the work carried out on relinquished sub-blocks in EL 24841 being part of Bondi Mining Ltd's Murphy Project area to 31 July 2011. EL 24841 is located over the western end of the Murphy Inlier, NT and is held by Murphy Uranium Pty Ltd; a wholly owned subsidiary of Bondi Mining Ltd. Work carried out on the relinquished sub-blocks comprised a detailed airborne magnetic and radiometric survey, a detailed geological interpretation, and regional alpha track-etch sampling, as part of the regional exploration program covering the entire Murphy Project area. Work carried out on the relinquished sub - blocks is described in the body of this report.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24841_2011_P.pdf7.03 MBPDF Add
CR2011-0745_Download-Link.pdf305.68 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader