Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76112
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMoore, Hen_US
dc.date.accessioned2013-10-28T05:36:49Z-
dc.date.issued2010en_US
dc.identifier.govdocCR2010-0950en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76112en_US
dc.description.abstractDuring the year the Company continued with an agreement with the CSIRO and fellow explorers Energy Metals Ltd and Thundelarra Exploration Ltd to undertake the CSIRO-Joint Surveys Uranium, Ngalia Basin Project. This collaborative project aims to identify the geological, structural, mineralogical, alteration and fluid flow characteristics of uranium mineralisation within the Ngalia basin. The project is funded by all parties and is expected to provide a robust understanding and framework that will drive future uranium exploration and mineralisation discoveries in the area. In August 2010 a ground based gravity survey was completed in association with the CSIRO-JSU with gravity stations across EL 24625 on nominal 1km spacing. Preliminary interpretation of the information has indicated that the northern section of EL 24625 is most prospective for palaeodrainage style uranium deposition within the basin sediments. Previous exploration by Cauldron has also highlighted the potential of the Eclipse Project to host suitable targets for uranium mineralisation. In particular Bigyrli style sandstone hosted uranium areas within EL 24625. A Mining Management Plan for the Eclipse Uranium Project was submitted to the Department of Resources in October 2010 proposing a drilling program of 44 holes within EL 24625 and a further 40 holes in EL 24808 targeting this style of sandstone hosted mineralisation.en_US
dc.subject.classificationUraniumen_US
dc.subject.classificationLiterature reviewsen_US
dc.subject.classificationGeophysical surveysen_US
dc.subject.classificationGravity surveysen_US
dc.subject.classificationGeophysical interpretationen_US
dc.titleEclipse Uranium Project EL24625 and EL 24637 Annual report to the Northern Territory, Department of Resources for the Year Ending 17 December 2010en_US
dc.relation.isatmap100Napperby 5452en_US
dc.relation.isatmap100Mount Wedge 5352en_US
dc.relation.isatmap100Aileron 5552en_US
dc.relation.isatmap100Narwietooma 5451en_US
dc.relation.isatmap100Anburla 5551en_US
dc.relation.isatmap250Hermannsburg SF5313en_US
dc.relation.isatmap250Napperby SF5309en_US
dc.relation.isatgeolprovinceAileron Provinceen_US
dc.relation.isatgeolprovinceNgalia Basinen_US
dc.description.stratnameStrangways Metamorphic Complexen_US
dc.identifier.tenureEL24625en_US
dc.identifier.tenureEL24637en_US
dc.description.modifyhistory18/01/2011en_US
dc.description.modifyhistory05/06/2013en_US
dc.description.modifyhistory07/10/2013en_US
dc.description.modifyhistory07/02/2014en_US
dc.description.modifyhistory06/03/2019en_US
dc.contributor.holderCauldron Energyen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2010en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24625_2010_GA_01.pdf4.46 MBPDF Add
EL24625_2010_GA_02_FileListing.pdf15.16 kBPDF Add
CR2010-0950_Geophysics.zip484.1 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader