Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75592
Export to Endnote
Title: | Year 3 Relinquishment report for EL 25229 Douglas River, for period ending 8 November 2009 |
Title Holder / Company: | Territory Uranium |
Report id: | CR2009-1035 |
Tenure: | EL25229 |
Year: | 2009 |
Author: | Muth, T Chapman, A |
Abstract: | EL 25229 is 120km south of Darwin (by road). Territory Uranium Company Ltd applied for EL25229 to explore for uranium mineralisation. Work during Year 1 of tenure consisted of a review of both NTGS data and geophysical data. A list of previous Tenure was compiled. Work during Year 2 included a full assessment of uranium targets within 3 Daly River Project tenements EL 25222, EL 25223 and EL 25229, followed by a helicopter reconnaissance program. At the end of year 2, EL25229 was reduced by 50%. During Year 3, geochemical sampling was undertaken at two new prospects on EL 25229. At the end of year 3, the tenement was reduced by 50% according to requirements; no work was undertaken on the relinquished ground in Year 3. This report details all the work done on the blocks of EL 25229 relinquished in the third year. |
Date Added: | 27-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25229_2009_P.pdf | 1.93 MB | Add | |
CR2009-1035_AppendixA.zip | 651.48 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.