Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75492
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDevencorn, Ben_US
dc.date.accessioned2013-10-27T22:43:40Z-
dc.date.issued2009en_US
dc.identifier.govdocCR2009-0869en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75492en_US
dc.description.abstractSection 32 of the Mining Act requires the submission of a Final Report prepared by the title holder for each surrendered exploration licence. This Final Report for Exploration Licence (EL) 24918 provides a summary of the activities carried out over the permit in the past year, including any results produced by these activities. EL 24918 is being completely relinquished by Tri-Star Energy Company because the company has determined the coal seam underlying this area is too deep to be economically mined. This licence has been part of a group of licences that were assembled to create a large area that could feasibly be exploited as a coal producing area. The area covered by the group licences will be referred to as the Project Area. Tri-Star Energy Company continues to work on the remainders of the tenures and anticipates that it shall ultimately create a large economic project. The work and expenditure program for EL 24918 during its third year required a geological and geophysical review of existing data and information towards determining the location of Permian coats within the Purni Formation and specifically, their depth, thickness, lateral extent and quantity. lt also required a seismic acquisition survey to be carried out over the Project Area. Tri-Star carried out an unconventional fourteen (14) point seismic acquisition survey over the Project Area and one of these seismic points are located in EL 24918. During this year, studies have resulted in Tri-Star Energy Company's final conclusion that the coal was too deep to economically produce. Tri-Star Energy Company has met all work and expenditure commitments for EL 24918 for the term of the licence.en_US
dc.subject.classificationCoal explorationen_US
dc.subject.classificationCoal seamsen_US
dc.subject.classificationGeophysical interpretationen_US
dc.titleFinal report for EL 24918 for the period ending 7 September 2009en_US
dc.relation.isatmap100Nuckua 6047en_US
dc.relation.isatmap100Andado 5947en_US
dc.relation.isatmap100McDills 5946en_US
dc.relation.isatmap100Finke 5846en_US
dc.relation.isatmap250McDills SG5307en_US
dc.relation.isatmap250Finke SG5306en_US
dc.relation.isatgeolprovincePedirka Basinen_US
dc.description.stratnamePurni Formationen_US
dc.identifier.tenureEL24918en_US
dc.description.modifyhistory02/12/2009en_US
dc.description.modifyhistory08/12/2009en_US
dc.description.modifyhistory07/06/2013en_US
dc.contributor.holderTri-Star Energy Companyen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2009en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR2009-0869_EL24918_-_Final_Report_-_01.12.09.pdf1.29 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader