Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75311
Export to Endnote
Title: Annual report for EL 24547 Nonouba for the period 17 August 2008 to 16 August 2009
Title Holder / Company: Deep Yellow
Report id: CR2009-0572
Tenure: EL24547
Year: 2009
Author: Bridgwater, HL
Abstract: During the first year of term exploration work was limited to planning a drilling programme and conducting a reconnaissance visit in preparation pending the completion of a site clearance survey by the Aboriginal Areas Protection Authority. AAPA issued an Authority Certificate with 11 exclusion zones on 30 August 2008 and an Authorisation under the Mining Management Act was granted on 1 September 2008 allowing the drilling programme to commence. DYL undertook an RC drilling programme throughout December 2008 of 10 drill holes totalling 1,148m.
Date Added: 24-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24547_2009_A.pdf2.13 MBPDF Add
CR2009-0572_Appendices.zip3.42 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader