Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75285
Export to Endnote
Title: | Annual report on EL 26499 Kirkimbie East to 17 July 2009 |
Title Holder / Company: | Ord River Resources |
Report id: | CR2009-0534 |
Tenure: | EL26499 |
Year: | 2009 |
Author: | Ulaiwi, L |
Abstract: | Suplejack Pty Ltd was granted EL 26499 on 18/07/2008 to search for copper in the Hardman Syncline area of the Ord River Basin. This report covers work done in the period 18 July 2008 to 17 July 2009. The tenement is located approximately 150 km Northeast of Halls Creek and 580 km southwest of Darwin. The tenement is wholly contained within the Ord River Regeneration area. Regional geology consists of the Lower Cambrian Antrim Plateau Volcanics and the overlying Middle Cambrian Headleys Limestone, Nelson Shale, Linnekar Limestone and Panton Formation within the Hardman Syncline. Work carried out in 2009 has consisted of a review of regional potential, re-evaluation of the model for mineralisation, review of geochemical data and assessment of relevant exploration methods. A detailed airborne magnetic and radiometric survey was also carried out over parts of the licence area. There are a many potential drilling targets present and outcropping mineralisation. No significant deposits have been found so far. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26499_2009_A.pdf | 1.38 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.