Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75013
Export to Endnote
Title: | Annual report for EL 23590 Frances Creek East, for the period 28 February 2008 to 27 February 2009 |
Title Holder / Company: | Territory Resources |
Report id: | CR2009-0130 |
Tenure: | EL23590 |
Year: | 2009 |
Author: | Hassall, I |
Abstract: | Work undertaken during the reporting year ending 27 February 2009 within EL 23590 was confined to desk top studies to prioritise the exploration efforts across Territory Resources iron ore tenements in the Northern Territory. Drilling on the active deposits on tenement ML 24727 took priority over drilling on EL 23590. In addition extensive heritage work was required to support exploration drilling, mine development, and production ramp-up on ML 24727. Availability of resources was such that significant ground work was not possible on this tenement; however, the tenement was visited to assess overall prospectivity for iron ore. The desk stop review and the field visit showed poor potential for iron ore. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL23590_2009_A_01.pdf | 842.23 kB | Add | |
EL23590_2009_A_02_Verification_List.txt | 3.78 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.