Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74204
Export to Endnote
Title: EL 24810 Plenty Highway Year 1, 2 August 2006 to 1 August 2007
Title Holder / Company: Hale Energy
Report id: CR2007-0666
Tenure: EL24810
Year: 2007
Abstract: The Plenty Highway Project is located in the Plenty River area about 125km northeast of Alice Springs. The project is part of two contiguous tenements that cover about 1,200km2 of the Tertiary Waite and Huckitta Basins within the Proterozoic Arunta Block, which are prospective for palaeo drainage hosted uranium mineralisation. The Plenty Highway passes through the south of the Plenty Highway project area. The prospective areas within the tenement are topographically flat and are covered by scrubland and grassland. The project area covers part of the Tertiary Waite and Huckitta Basins which are relatively shallow sedimentary basins; the central portions of which were probably lakes during most of the time of deposition of their sediments. The basins were fed from both the Harts Range metamorphic rocks in the south and by various channels that drain areas of Proterozoic granitic and metamorphic rocks to the north. The sedimentary sequence within the basin is dominated by clays and sandy clays, with lesser amounts of sands. Lignite and evaporite horizons are also present. The sediments were subject to slight uplift during the late Pliocene and the upper parts of the sequence have been eroded in part. The sequence is poorly known, with the approximate 1,200km2 of basin within the project areas having been tested by only about 15 drill-holes. Within the Plenty Highway tenement basement was reached in only one hole and the basin is known to be in excess of 200m vertical depth at it's deepest point. Early stratigraphic information was obtained by the BMR, which drilled two holes into the basin during the 1960s. Alcoa explored the basins for uranium during 1979 and 1980. Alcoa drilled 71 holes to maximum depths of 200m for a total of 6,260 metres. Of these holes, six were drilled within the area of EL 24810 and a further six within that the adjacent tenement EL 25378. Significant uranium intersections were only achieved in four holes, drilled outside Hale Energy's project areas. The best intersection, at a depth of 104m, was of 45ppm U3O8 within a reducing horizon of pyritic carbonaceous silt. GPX Airborne Services were contracted to complete an airborne electromagnetic survey over the area. In late November of 2006, a helicopter borne time domain electromagnetic survey (HoistEM) was flown over the tenement. The survey consisted of 126 traverses with 400m line spacing, collected in a North-South Orientation for a total collection of approximately 1800 line km of data. The HoistEM Data was then modelled and interpreted by Dave McInnes of Montana GIS Pty Ltd. His report was forwarded to the company in April. A drill programme to test the anomalies identified from the HoistEM survey was scheduled for September 2007.
NOTESee CR2010-0895 for geophysics
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24810_2007_A_01.pdf167.08 kBPDF Add
EL24810_2007_A_02_Plenty_Hoistem_Report.pdf1.91 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader