Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73592
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHills, Qen_US
dc.date.accessioned2013-10-23T21:02:48Z-
dc.date.issued2006en_US
dc.identifier.govdocCR2006-0104en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73592en_US
dc.description.abstractThis report summarises work carried out on Exploration License 23629, Arunta Project, Northern Territory for the year ended 6th March 2006. Through compilation efforts, Falconbridge (Australia) Pty Limited identified the north-central Arunta as being favourable to host Proterozoic, intrusive related, magmatic Ni-Cu-PGE sulphide mineralization, analogous to the giant Voiseys Bay nickel-copper deposit in Canada. The area has seen little historic work and has not been the focus of dedicated nickel sulphide exploration in recent years. In December 2003, Discovery Nickel Limited acquired 100% interest in EL23629 and other Falconbridge tenements following the successful listing of Discovery Nickel on the Australian Stock Exchange. Most significant nickel-copper massive sulphide deposits are extremely good conductors. Discovery Nickel's exploration approach relies heavily on airborne electromagnetic (AEM) surveying, followed up by ground EM to define targets. Falconbridge commissioned an AEM survey over the Arunta tenements in early 2003 and after analysis of the Falconbridge AEM results, Discovery Nickel Limited commissioned a ground EM (SMARTEM) survey focused on the highest priority target areas. The results did not highlight any strong anomalies/basement conductors that warranted drill testing on EL 23629. Drilling at prospect B1 on EL 23392, south of EL 23629 intersected a significant new sulphide system. Additional airborne EM (GEOTEM) was collected during October 2004 over areas on EL 23395 and EL 23391. In 2005 DNL exploration efforts were restricted due to problems securing contractors to collect additional ground EM and drilling. Reassessment of 2004 GEOTEM in light of success at B1 on EL 23392 highlighted additional targets for follow-up. In late 2005 DNL was able to finally collect additional EM along strike from the B1 prospect. However, unfortunately failed to cover any of the new targets on EL 23629 before the onset of the wet season.en_US
dc.subject.classificationNickelen_US
dc.subject.classificationCopperen_US
dc.subject.classificationPlatinum group elementsen_US
dc.subject.classificationAerial EM surveysen_US
dc.titleAnnual report for EL 23629, Arunta Project, for the year ended 6 March 2006en_US
dc.relation.isatmap100Anningie 5554en_US
dc.relation.isatmap250Mount Peake SF5305en_US
dc.relation.isatgeolprovinceArunta Regionen_US
dc.description.stratnameHatches Creek Groupen_US
dc.description.stratnameReynolds Range Groupen_US
dc.identifier.tenureEL23629en_US
dc.description.modifyhistory05/05/2006en_US
dc.description.modifyhistory07/06/2013en_US
dc.description.modifyhistory28/11/2013en_US
dc.contributor.holderDiscovery Nickelen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2006en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL23629_2006_A_01.pdf1.14 MBPDF Add
EL23629_2006_A_02_Variation_of_Covenant.pdf171.11 kBPDF Add
EL23629_2006_A_03_Additional_Data.pdf2.66 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader