Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73447
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.date.accessioned | 2013-10-23T20:49:51Z | - |
dc.date.issued | 2005 | en_US |
dc.identifier.govdoc | CR2005-0464 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73447 | en_US |
dc.description.abstract | EL 22332 formed part of a farmin agreement between Rio Tinto Exploration Pty Ltd (Rio Tinto) and Diamond Mines Australia Pty Ltd (DMA) covering numerous Rio Tinto-controlled tenements and applications in the Northern Territory. Under this agreement, DMA is conducting predominantly diamond exploration over the tenements utilising the Falcon airborne gravity gradiometer system to detect kimberlite pipes. Gravity Diamonds Ltd is managing the farmin arrangement for Diamond Mines Australia and owns 100% of DMA. During the first year of tenure, Rio Tinto conducted a thorough a review of historic exploration data, including considerable surface sampling focussed on diamonds, and recommended divestment of the tenement. The timing of the divestment arrangement with DMA during year two of tenure precluded the instigation of field exploration activities on EL 22332 during 2003. The planned program for EL 22332 during 2004 was contingent on Gravity Diamonds achieving access clearance for follow up of Falcon survey targets in the nearby Tee Dee Hill area which, like EL 22332 forms part of the original Rio Tinto 'Victoria Project Area'. Gravity was not able to get the required access clearances and this resulted in the postponement of planned exploration on EL 22332 during the 2004 field season. No onground work was completed in the tenement during 2004 and one hundred and fifty-one blocks were relinquished from EL 22332 at the conclusion of Year 3. Gravity handed back the licence to Rio Tinto in June 2005 and the licence was subsequently surrendered on 11 July 2005. | en_US |
dc.subject.classification | Diamond exploration | en_US |
dc.subject.classification | Land access | en_US |
dc.title | Final report on exploration activities for EL 22332 Sailor Creek, Victoria River Region | en_US |
dc.relation.isatmap100 | Newry 4765 | en_US |
dc.relation.isatmap100 | Kildurk 4865 | en_US |
dc.relation.isatmap250 | Waterloo SE5203 | en_US |
dc.relation.isatgeolprovince | Victoria-Birrindudu Basin | en_US |
dc.relation.isatgeolprovince | Ord Basin | en_US |
dc.identifier.tenure | EL22332 | en_US |
dc.description.modifyhistory | 23/11/2005 | en_US |
dc.description.modifyhistory | 16/03/2006 | en_US |
dc.description.modifyhistory | 04/06/2010 | en_US |
dc.description.modifyhistory | 07/06/2013 | en_US |
dc.contributor.holder | Gravity Diamonds | en_US |
dc.contributor.holder | Diamond Mines Australia | en_US |
dc.contributor.holder | Ashton Mining | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR2005 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL22332_2005_AS.pdf | 450.25 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.