Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73445
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.date.accessioned2013-10-23T20:49:41Z-
dc.date.issued2005en_US
dc.identifier.govdocCR2005-0462en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73445en_US
dc.description.abstractEL 8819, one of the Arnold River group of tenements, is centred approximately 150 km northeast of Daly Waters in the Northern Territory, within the Hodgson Downs 1:250,000 map sheet. The EL was granted to Ashton Mining on 24th July 2000. Ashton Mining Ltd was taken over by Rio Tinto Limited in the 4th quarter of 2000. EL 8819 and the other Arnold River tenements formed part of a farmin agreement between Rio Tinto Exploration Pty Ltd ('Rio Tinto') and Diamond Mines Australia Pty Ltd ('DMA') covering numerous Rio Tinto tenements and applications in the Northern Territory. Under this agreement, DMA is conducting predominantly diamond exploration by utilising the Falcon(tm) airborne gravity gradiometer system to detect kimberlite pipes. Gravity Diamonds Ltd ('Gravity') is managing the farmin arrangement for Diamond Mines Australia and owns 100% of DMA. The Arnold River tenements are considered prospective for commercial sources of diamonds. Historic gravel sampling shows that there are unresolved chromite and diamond occurrences in an area of Bukalara Sandstone on one of the EL's in the Arnold River group (EL 7970). Gravity completed an assessment of the data compilation work carried out by Rio Tinto and concluded that the area covered by EL 8819 was not of sufficient priority to warrant a Falcon(tm) survey in the initial stages of the DMA-Rio Tinto farmin arrangement. No field work was carried out and the area was reviewed following the results from the Falcon(tm) survey completed some 25 kilometres to the southeast. This led to the relinquishment of twenty five (25) blocks from the licence during 2004. Gravity handed back EL 8819 to Rio Tinto in June 2005 and the licence was subsequently surrendered on 11 July 2005. There was no further work undertaken by Rio Tinto from the time the licence was handed back in June 2005 and the date of surrender on 11 July 2005.en_US
dc.subject.classificationDiamond explorationen_US
dc.subject.classificationIndicator mineralsen_US
dc.subject.classificationGravity gradiometersen_US
dc.subject.classificationGravity interpretationen_US
dc.titleFinal report on exploration activities for EL 8819, Arnold River Tenement, Hodgson Diamonds Projecten_US
dc.relation.isatmap100St. Vidgeon 5867en_US
dc.relation.isatmap100Cox 5866en_US
dc.relation.isatmap250Hodgson Downs SD5314en_US
dc.relation.isatgeolprovinceDunmarra Basinen_US
dc.relation.isatgeolprovinceMcArthur Basinen_US
dc.relation.isatgeolprovinceCarpentaria Basinen_US
dc.description.stratnameRoper Groupen_US
dc.description.stratnameBukalara Sandstoneen_US
dc.identifier.tenureEL8819en_US
dc.description.modifyhistory23/11/2005en_US
dc.description.modifyhistory16/03/2006en_US
dc.description.modifyhistory07/06/2013en_US
dc.contributor.holderGravity Diamondsen_US
dc.contributor.holderDiamond Mines Australiaen_US
dc.contributor.holderAshton Miningen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR2005en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL8819_2005_AS.pdf454.97 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader