Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73379
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Nicholls, ML | en_US |
dc.date.accessioned | 2013-10-23T20:44:11Z | - |
dc.date.issued | 1994 | en_US |
dc.identifier.govdoc | CR1994-0704 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73379 | en_US |
dc.description.abstract | A two stage gold mining plan is proposed for MCN 4631. In the first stage documented, overburden would be removed with a 40 t excavator and D85 dozer. The excavator would then load ore directly into road trains for transport to either Cosmo Howley or Pine Creek. The second stage would be underground mining using shaft and stope. [Neither stage was carried out]. | en_US |
dc.subject.classification | Mine management | en_US |
dc.subject.classification | Mine planning | en_US |
dc.title | Proposed mine plan for MCN 4631 | en_US |
dc.relation.isatmap100 | Batchelor 5171 | en_US |
dc.relation.isatmap250 | Pine Creek SD5208 | en_US |
dc.relation.isatgeolprovince | Pine Creek Orogen | en_US |
dc.identifier.tenure | MCN4631 | en_US |
dc.description.modifyhistory | 15/08/2008 | en_US |
dc.description.modifyhistory | 12/10/2005 | en_US |
dc.description.modifyhistory | 23/04/2009 | en_US |
dc.description.modifyhistory | 11/06/2014 | en_US |
dc.contributor.holder | All Earth Industries | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR1994 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19940704.pdf | 3.46 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.