Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73097
Export to Endnote
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Elliot, MJ | en_US |
dc.date.accessioned | 2013-10-23T20:23:40Z | - |
dc.date.issued | 1966 | en_US |
dc.identifier.govdoc | CR1966-0011 | en_US |
dc.identifier.uri | https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73097 | en_US |
dc.description.abstract | This report outlines the volume of iron ore and overburden on the Helene 6 and 7 leases. The total ore calculated is 4,440,000 tons. The mineable tonnage of ore is 4,335,000 tons. | en_US |
dc.description.abstract | The mineable tonnage has been arrived at by eliminating parts of the ore body that are so thin or at such depths as to be probably uneconomic to mine. | en_US |
dc.subject.classification | Iron ores | en_US |
dc.subject.classification | Production | en_US |
dc.subject.classification | Overburden | en_US |
dc.title | Report on Drilling and Ore Reserves Calculations Helene 6 and Helene 7. | en_US |
dc.relation.isatmap100 | Pine Creek 5270 | en_US |
dc.relation.isatmap250 | Pine Creek SD5208 | en_US |
dc.relation.isatgeolprovince | Pine Creek Orogen | en_US |
dc.description.mineprospectname | Helene 6 | en_US |
dc.description.mineprospectname | Helene 7 | en_US |
dc.identifier.tenure | NotKnown | en_US |
dc.description.modifyhistory | 18/12/2007 | en_US |
dc.description.modifyhistory | 14/11/2016 | en_US |
dc.contributor.holder | Frances Creek Iron Mining | en_US |
dc.identifier.collectionname | Minerals Exploration Reports (MEX) | en_US |
dc.identifier.govdocprefix | CR1966 | en_US |
local.flag.notified | 1 | |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19660011.pdf | 10.32 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.